Revision history of "Removal of Fibrocement in School Buildings — Basic School of Ceira" (Q3357341)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

16 June 2023

23 May 2023

8 November 2022

7 August 2022

  • curprev 01:0701:07, 7 August 2022DG Regio talk contribs 39,869 bytes +24,438 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 June 2022

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

29 November 2021

  • curprev 15:0715:07, 29 November 2021DG Regio talk contribs 8,433 bytes +1,142 Created claim: summary (P836): The replacement of roof tiles and replacement of the cafeteria extractors, air conditioners and external tubing of ventilation systems. The roofs of this school’s buildings drain to internal shutters, draining to iron drop pipes that in some situations are embedded and in their entirety obstructed, among other works., translated_summary
  • curprev 15:0715:07, 29 November 2021DG Regio talk contribs 7,291 bytes +127 Changed label, description and/or aliases in en: translated_label

26 October 2021