Revision history of "NPO-DRR_IC_Šentjur South — 3" (Q3277567)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

6 March 2024

19 June 2023

10 June 2023

8 March 2023

10 October 2022

5 August 2022

  • curprev 01:4201:42, 5 August 2022DG Regio talk contribs 39,076 bytes +23,316 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv, nl, fr, de, it, sl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv,

7 February 2022

14 January 2022

13 January 2022

11 January 2022

29 November 2021

  • curprev 17:4517:45, 29 November 2021DG Regio talk contribs 13,248 bytes +1,136 Created claim: summary (P836): Het doel van de operatie is de regulering van de vervoers-, nuts- en energie-infrastructuur en de uitvoering van overstromingsmaatregelen in het industriegebied Šentjur South — 3, waardoor de toegang wordt gewaarborgd tot de bouwgronden waarop de bedrijfsactiviteit zal worden uitgevoerd binnen de bedrijfszone., translated_summary
  • curprev 17:4517:45, 29 November 2021DG Regio talk contribs 12,112 bytes +89 Changed label, description and/or aliases in nl: translated_label
  • curprev 16:3316:33, 29 November 2021DG Regio talk contribs 12,023 bytes +1,155 Created claim: summary (P836): Ziel des Vorhabens ist die Regulierung der Verkehrs-, Versorgungs- und Energieinfrastruktur sowie die Bereitstellung von Hochwasserschutzmaßnahmen in der Industriezone Šentjur Süd – 3, wodurch der Zugang zu den Baugrundstücken gewährleistet wird, auf denen die Geschäftstätigkeit innerhalb der Geschäftszone ausgeübt wird., translated_summary
  • curprev 16:3316:33, 29 November 2021DG Regio talk contribs 10,868 bytes +89 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 13:3913:39, 27 November 2021DG Regio talk contribs 10,779 bytes +1,178 Created claim: summary (P836): L’objectif de l’opération est la réglementation des infrastructures de transport, d’utilité publique et d’énergie et la mise en place de mesures d’inondation dans la zone industrielle de Šentjur Sud-3, garantissant ainsi l’accès aux terrains sur lesquels l’activité commerciale sera exercée à l’intérieur de la zone d’activité., translated_summary
  • curprev 13:3913:39, 27 November 2021DG Regio talk contribs 9,601 bytes +88 Changed label, description and/or aliases in fr: translated_label

20 October 2021

19 October 2021

  • curprev 09:5309:53, 19 October 2021DG Regio talk contribs 8,666 bytes +90 Changed label, description and/or aliases in en: translated_label
  • curprev 09:5309:53, 19 October 2021DG Regio talk contribs 8,576 bytes +1,127 Created claim: summary (P836): The object of the operation is the regulation of transport, utilities and energy infrastructure and the provision of flood-flood measures in the Šentjur South — 3 industrial zone, thereby ensuring access to the building plots on which the business activity will be carried out within the business zone., translated_summary

13 October 2021

12 October 2021