Revision history of "Safety-technical upgrade of the Karavanke railway tunnel" (Q3276898)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 11:3611:36, 9 October 2024DG Regio talk contribs 50,700 bytes +1 Changed label, description and/or aliases in pt
  • curprev 11:3611:36, 9 October 2024DG Regio talk contribs 50,699 bytes −24 Set a claim value: summary (P836): O túnel ferroviário de Karavanke existente, no qual corre uma linha férrea eletrificada de duas vias, está em muito mau estado. O túnel de Karavanke não fornece um gabarito de obstáculos suficiente (gabarito mínimo de brilho existente) em conformidade com as normas modernas da rede ferroviária europeia. Os objectivos básicos a atingir com a realização do projecto consistem em melhorar o tráfego ferroviário e a segurança dos passageiros, bem como a g...

6 March 2024

10 June 2023

8 March 2023

10 October 2022

5 August 2022

  • curprev 01:2501:25, 5 August 2022DG Regio talk contribs 48,780 bytes +30,360 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv, nl, fr, de, it, sl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, bg, mt, pt, da, ro, sv,

7 February 2022

14 January 2022

13 January 2022

11 January 2022

29 November 2021

  • curprev 17:4417:44, 29 November 2021DG Regio talk contribs 15,133 bytes +1,513 Created claim: summary (P836): De bestaande Karavanke-spoortunnel, waarin een geëlektrificeerde tweesporenspoorlijn loopt, verkeert in zeer slechte staat. De Karavanke Tunnel biedt niet voldoende omgrenzingsprofiel (bestaande minimale helderheidsmeter) in overeenstemming met de moderne normen van het Europese spoorwegnet. De belangrijkste doelstellingen die met de verwezenlijking van het project moeten worden bereikt, zijn het verbeteren van de veiligheid van het spoorverkeer...
  • curprev 17:4417:44, 29 November 2021DG Regio talk contribs 13,620 bytes +121 Changed label, description and/or aliases in nl: translated_label
  • curprev 16:3116:31, 29 November 2021DG Regio talk contribs 13,499 bytes +1,539 Created claim: summary (P836): Der bestehende Karavanke Eisenbahntunnel, in dem eine elektrifizierte zweigleisige Eisenbahnstrecke verläuft, befindet sich in sehr schlechtem Zustand. Der Karavanke-Tunnel verfügt nicht über eine ausreichende Bauspur (bestehende Mindesthelligkeitsanzeige) im Einklang mit den modernen Standards des europäischen Eisenbahnnetzes. Die Hauptziele, die bei der Durchführung des Projekts zu erreichen sind, sind die Verbesserung der Eisenbahnverkehrs- u...
  • curprev 16:3116:31, 29 November 2021DG Regio talk contribs 11,960 bytes +126 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 13:2613:26, 27 November 2021DG Regio talk contribs 11,834 bytes +1,517 Created claim: summary (P836): Le tunnel ferroviaire existant de Karavanke, dans lequel passe une ligne de chemin de fer électrifiée à deux voies, est en très mauvais état. Le tunnel de Karavanke ne fournit pas un gabarit de structure suffisant (gabarit de luminosité minimum existant) conforme aux normes modernes du réseau ferroviaire européen. Les objectifs fondamentaux à atteindre par la réalisation du projet sont d’améliorer le trafic ferroviaire et la sécurité des voyageu...
  • curprev 13:2613:26, 27 November 2021DG Regio talk contribs 10,317 bytes +134 Changed label, description and/or aliases in fr: translated_label

20 October 2021

19 October 2021

  • curprev 09:4509:45, 19 October 2021DG Regio talk contribs 9,336 bytes +115 Changed label, description and/or aliases in en: translated_label
  • curprev 09:4509:45, 19 October 2021DG Regio talk contribs 9,221 bytes +1,415 Created claim: summary (P836): The existing Karavanke railway tunnel, in which an electrified two-track railway line runs, is in very poor condition. The Karavanke Tunnel does not provide sufficient structure gauge (existing minimum brightness gauge) in line with modern standards of the European rail network. The basic objectives to be achieved by the realisation of the project are to improve rail traffic and passenger safety and safe and efficient disaster management, while...

13 October 2021

12 October 2021