Revision history of "RESTORATION OF VAULTS OF THE CHURCH OF SAN MIGUEL AND OPTIONAL DIRECTION IN AGUILAR DE CAMPOO, PALENCIA" (Q3229485)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

12 June 2023

11 June 2023

18 August 2022

  • curprev 16:4016:40, 18 August 2022DG Regio talk contribs 46,745 bytes +30,030 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

17 January 2022

18 December 2021

10 December 2021

5 December 2021

21 October 2021

14 October 2021

  • curprev 09:1109:11, 14 October 2021DG Regio talk contribs 10,515 bytes +163 Changed label, description and/or aliases in en: translated_label
  • curprev 09:1109:11, 14 October 2021DG Regio talk contribs 10,352 bytes +1,322 Created claim: summary (P836): The performances extend to the whole of the vaults that cover the three naves of the temple, cruiser and presbytery. They consist of the minting of nerves and plementeries, the general cleaning of stains of old leaks, the removal of recent fakes, and the replacement of finishing with lime mortar using as model the feigned cuttings restored from the previously restored vault. Check and balance the loads on the breasts of all vaults and remove sta...

12 October 2021

10 October 2021

9 October 2021