Revision history of "Construction of a segregated lane for pedestrians and bicycles in the BV2115, between the Iberian round and Vilanova Park campsite in Vilanova and la Geltrú" (Q3217130)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 11:3711:37, 8 October 2024DG Regio talk contribs 112,717 bytes −8 Changed label, description and/or aliases in pt
  • curprev 11:3711:37, 8 October 2024DG Regio talk contribs 112,725 bytes −1 Set a claim value: summary (P836): The projected path has a total distance of 2,104 meters, connecting the urban center of Vilanova i la Geltrú, in particular at the roundabout at the crossing of the BV-2115 road with the Iberian Ronda, with the Vilanova Park campsite, on a track which runs along the margin along the roadside._x000D_ _x000D_ Currently, pedestrians and cyclists use the margins of the road to connect the campsite with the urban center of Vilanova, without the minimum s...

7 March 2024

12 June 2023

22 February 2023

18 August 2022

  • curprev 14:0114:01, 18 August 2022DG Regio talk contribs 110,978 bytes +77,246 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

16 January 2022

17 December 2021

10 December 2021

5 December 2021

21 October 2021

12 October 2021

11 October 2021

10 October 2021

9 October 2021