Revision history of "Reducing the energy intensity of the municipal office building in the village of Víťaz" (Q3108008)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

19 June 2023

10 June 2023

27 September 2022

4 August 2022

  • curprev 03:4703:47, 4 August 2022DG Regio talk contribs 67,433 bytes +43,630 Changed label, description and/or aliases in et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, sk, es, and other parts: Adding translations: et, lt, hr, el, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

4 December 2021

29 November 2021

  • curprev 23:1423:14, 29 November 2021DG Regio talk contribs 16,355 bytes +2,255 Created claim: summary (P836): Hauptziel des Projekts ist es, den Energieverbrauch während des Betriebs des öffentlichen Gebäudes – Gemeindeamt im Dorf Ví‚az durch die Umsetzung der optimalen Kombination ausgewählter Maßnahmen zu reduzieren. Gegenstand des Projekts ist die umfassende Isolierung des Gebäudes des Gemeindeamtes (Isolierung der Fassade, Dachbedeckung, Bodenböden des Erdgeschosses und Ersatz offener Strukturen). Das Projekt befasst sich auch mit dem Austausch von...
  • curprev 23:1423:14, 29 November 2021DG Regio talk contribs 14,100 bytes +140 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 16:3816:38, 27 November 2021DG Regio talk contribs 13,960 bytes +2,400 Created claim: summary (P836): L’objectif principal du projet est de réduire la consommation d’énergie lors de l’exploitation du bâtiment public — Bureau municipal dans le village de Ví’az grâce à la mise en œuvre de la combinaison optimale des mesures sélectionnées. Le sujet du projet est l’isolation complète du bâtiment du bureau municipal (isolation de la façade, revêtement de toiture, planchers du rez-de-chaussée et remplacement des structures ouvertes). Le projet porte é...
  • curprev 16:3816:38, 27 November 2021DG Regio talk contribs 11,560 bytes +168 Changed label, description and/or aliases in fr: translated_label

28 September 2021

  • curprev 14:4214:42, 28 September 2021DG Regio talk contribs 11,392 bytes +2,208 Created claim: summary (P836): The main objective of the project is to reduce energy consumption during the operation of the public building – Municipal Office in the village of Víťaz through the implementation of the optimal combination of selected measures. The subject of the project is the comprehensive insulation of the building of the municipal office (insulation of the facade, roof covering, floor floors of the ground floor and replacement of open structures). The proje...

27 September 2021

23 September 2021

16 September 2021

15 September 2021

  • curprev 15:3215:32, 15 September 2021DG Regio talk contribs 10,534 bytes +147 Changed label, description and/or aliases in en: translated_label
  • curprev 15:3215:32, 15 September 2021DG Regio talk contribs 10,387 bytes +2,208 Created claim: summary (P836): The main objective of the project is to reduce energy consumption during the operation of the public building – Municipal Office in the village of Víťaz through the implementation of the optimal combination of selected measures. The subject of the project is the comprehensive insulation of the building of the municipal office (insulation of the facade, roof covering, floor floors of the ground floor and replacement of open structures). The proje...

14 September 2021