Revision history of "TERMINAL DEPARTURES EXTERNAL RACES" (Q3100310)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:1709:17, 10 October 2024DG Regio talk contribs 108,775 bytes −5 Changed label, description and/or aliases in pt
  • curprev 09:1709:17, 10 October 2024DG Regio talk contribs 108,780 bytes +17 Set a claim value: summary (P836): O objetivo geral do projeto é desenvolver a infraestrutura de transporte do Aeroporto Internacional de Traian Vuia Timisoara através da construção de um novo terminal de partidas para voos externos de passageiros, a fim de assegurar um tráfego aéreo alargado, com as máximas condições de segurança e um grau adequado de segurança, em conformidade com a regulamentação europeia e nacional no domínio do transporte aéreo. O objetivo geral do projeto contr...

5 June 2024

7 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:5623:56, 3 August 2022DG Regio talk contribs 109,009 bytes +71,575 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

6 December 2021

1 December 2021

  • curprev 08:3108:31, 1 December 2021DG Regio talk contribs 25,330 bytes +3,913 Created claim: summary (P836): Allgemeines Ziel des Projekts ist die Entwicklung der Verkehrsinfrastruktur des internationalen Flughafens Traian Vuia Timisoara durch den Bau eines neuen Abflugterminals für externe Passagierflüge, um einen erweiterten Flugverkehr mit maximalen Sicherheitsbedingungen und einem angemessenen Sicherheitsniveau im Einklang mit den europäischen und nationalen Vorschriften im Bereich des Luftverkehrs zu gewährleisten. Das allgemeine Ziel des Projekts...
  • curprev 08:3108:31, 1 December 2021DG Regio talk contribs 21,417 bytes +92 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:2915:29, 27 November 2021DG Regio talk contribs 21,325 bytes +4,031 Created claim: summary (P836): L’objectif général du projet est de développer l’infrastructure de transport de l’aéroport international Traian Vuia Timisoara par la construction d’un nouveau terminal de départ pour les vols extérieurs de passagers, afin d’assurer un trafic aérien étendu, avec des conditions de sécurité maximales et un degré de sécurité adéquat, conformément à la réglementation européenne et nationale dans le domaine du transport aérien. L’objectif général du...
  • curprev 15:2915:29, 27 November 2021DG Regio talk contribs 17,294 bytes +96 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 11:1511:15, 16 September 2021DG Regio talk contribs 15,406 bytes +93 Changed label, description and/or aliases in en: translated_label
  • curprev 11:1511:15, 16 September 2021DG Regio talk contribs 15,313 bytes +3,619 Created claim: summary (P836): The general objective of the project is to develop the transport infrastructure of Traian Vuia Timisoara International Airport by constructing a new departure terminal for external passenger flights, in order to ensure an extended air traffic, with maximum safety conditions and an adequate degree of security, in accordance with European and national regulations in the field of air transport. The general objective of the project contributes to in...

14 September 2021