Revision history of "Increase the load-bearing capacity and upgrade the landing runway and the associated movement areas at “George Enescu” International Airport Bacău" (Q3099898)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:1709:17, 10 October 2024DG Regio talk contribs 56,983 bytes +2 Changed label, description and/or aliases in pt
  • curprev 09:1709:17, 10 October 2024DG Regio talk contribs 56,981 bytes +16 Set a claim value: summary (P836): O objetivo estratégico do projeto é aumentar a conectividade e a mobilidade da zona através de um aumento do volume de passageiros que transitarão pelo aeroporto. Para atingir este objectivo, foram estabelecidos os seguintes objectivos técnicos do projecto: O cumprimento dos requisitos do Regulamento (UE) n.o 139/2014 através da reconstrução das superfícies das pistas, da construção de cais de acostagem e de plataformas anti-respiração; cumprimento...

22 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:4423:44, 3 August 2022DG Regio talk contribs 57,722 bytes +34,866 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 09:0009:00, 1 December 2021DG Regio talk contribs 17,091 bytes +1,681 Created claim: summary (P836): Strategisches Ziel des Projekts ist es, die Konnektivität und Mobilität des Gebiets durch ein erhöhtes Passagieraufkommen zu erhöhen, das den Flughafen durchqueren wird. Um dieses Ziel zu erreichen, wurden folgende technische Ziele des Projekts festgelegt: Einhaltung der Anforderungen der Verordnung 139/2014 durch den Wiederaufbau der Pistenflächen, den Bau von Liegeplätzen und Atemschutzplattformen; Einhaltung der Sicherheits- und Sicherheitsan...
  • curprev 09:0009:00, 1 December 2021DG Regio talk contribs 15,410 bytes +218 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 15:1715:17, 27 November 2021DG Regio talk contribs 15,192 bytes +1,766 Created claim: summary (P836): L’objectif stratégique du projet est d’accroître la connectivité et la mobilité de la région en augmentant le nombre de passagers qui transiteront par l’aéroport. Afin d’atteindre cet objectif, les objectifs techniques suivants du projet ont été établis: le respect des exigences du règlement (UE) no 139/2014 par la reconstruction des surfaces de piste, la construction de postes d’amarrage et de plates-formes anti-respiration; le respect des exig...
  • curprev 15:1715:17, 27 November 2021DG Regio talk contribs 13,426 bytes +228 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 11:1311:13, 16 September 2021DG Regio talk contribs 11,398 bytes +211 Changed label, description and/or aliases in en: translated_label
  • curprev 11:1311:13, 16 September 2021DG Regio talk contribs 11,187 bytes +1,644 Created claim: summary (P836): The strategic objective of the project is to increase the connectivity and mobility of the area through an increased volume of passengers who will transit the airport. In order to achieve this objective, the following technical objectives of the project have been established: compliance with the requirements of Regulation 139/2014 by rebuilding the runway surfaces, construction of berths and anti-breathing platforms; compliance with safety and s...

14 September 2021