Revision history of "Rehabilitation works for railway bridges, bridges and tunnels – SRCF Iasi phase II a" (Q3098915)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:3423:34, 8 October 2024DG Regio talk contribs 108,364 bytes +4 Changed label, description and/or aliases in pt
  • curprev 23:3423:34, 8 October 2024DG Regio talk contribs 108,360 bytes +25 Set a claim value: summary (P836): O objetivo geral do projeto está diretamente ligado ao sistema operacional 2.7 e promove um sistema de transportes sustentável que garanta a eficiência, a rapidez e a segurança da circulação de mercadorias e pessoas, acompanhado de um nível adequado de serviços de acordo com as normas europeias, a nível nacional e europeu. O principal objectivo do projecto é a reabilitação de 5 pontes, 13 pontes e 1 túnel. O projecto está dividido em duas fases, das...

20 March 2024

12 June 2023

21 February 2023

3 August 2022

  • curprev 23:1023:10, 3 August 2022DG Regio talk contribs 109,092 bytes +71,544 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 25,541 bytes +3,858 Created claim: summary (P836): Das übergeordnete Ziel des Projekts steht in direktem Zusammenhang mit OS 2.7 und fördert ein nachhaltiges Verkehrssystem, das die Effizienz, Geschwindigkeit und Sicherheit der Beförderungen von Gütern und Personen sowie ein angemessenes Maß an Dienstleistungen nach europäischen Normen auf nationaler und europäischer Ebene gewährleistet. Hauptziel des Projekts ist die Sanierung von 5 Brücken, 13 Brücken und 1 Tunnel. Das Projekt ist in zwei Phas...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 21,683 bytes +146 Changed label, description and/or aliases in de: translated_label

27 November 2021

  • curprev 14:4314:43, 27 November 2021DG Regio talk contribs 21,537 bytes +3,993 Created claim: summary (P836): L’objectif général du projet est directement lié à l’OS 2.7 et promeut un système de transport durable qui garantisse l’efficacité, la rapidité et la sécurité des mouvements de marchandises et de personnes, accompagné d’un niveau approprié de services conformes aux normes européennes, au niveau national et européen. L’objectif principal du projet est la remise en état de 5 ponts, 13 ponts et 1 tunnel. Le projet est divisé en deux phases, dont la...
  • curprev 14:4314:43, 27 November 2021DG Regio talk contribs 17,544 bytes +151 Changed label, description and/or aliases in fr: translated_label

9 October 2021

8 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

16 September 2021

  • curprev 10:5710:57, 16 September 2021DG Regio talk contribs 15,593 bytes +145 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5710:57, 16 September 2021DG Regio talk contribs 15,448 bytes +3,728 Created claim: summary (P836): The overall objective of the project is directly linked to OS 2.7 and promotes a sustainable transport system that ensures the efficiency, speed and safety of movements of goods and persons, accompanied by an appropriate level of services to European standards, at national and European level. The main objective of the project is the rehabilitation of 5 bridges, 13 bridges and 1 tunnel. The project is divided into two phases, of which phase II is...

14 September 2021