Revision history of "Phase of the project Rehabilitation of water supply system, sewerage system and treatment plants in Vaslui, Bârlad, Huși and Negreşti agglomerations – Vaslui County CCI [2011 RO 161 PR 007]" (Q3095596)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:4909:49, 9 October 2024DG Regio talk contribs 89,026 bytes +10 Changed label, description and/or aliases in pt
  • curprev 09:4909:49, 9 October 2024DG Regio talk contribs 89,016 bytes +60 Set a claim value: summary (P836): O objetivo estratégico do projeto é aumentar o nível de recolha e tratamento das águas residuais urbanas, bem como assegurar o abastecimento de água potável da população nas localidades das aglomerações de Vaslui, Barlad, Husi e Negresti. Os principais objetivos específicos do projeto são os seguintes: assegurar serviços adequados de abastecimento de água e de saneamento a preços acessíveis; garantir uma qualidade adequada da água potável em todas a...

26 June 2024

  • curprev 08:1608:16, 26 June 2024DG Regio talk contribs 88,956 bytes +220 Set a claim value: summary (P836): L’objectif stratégique du projet est d’augmenter le niveau de collecte et de traitement des eaux usées urbaines, ainsi que le degré d’approvisionnement en eau potable de la population dans les localités des agglomérations de Vaslui, Barlad, Husi et Negresti. Les objectifs spécifiques du projet sont les suivants: — Assurer des services adéquats d’approvisionnement en eau et d’assainissement à des prix abordables; — Assurer une qualité suffisante de l...

5 June 2024

12 March 2024

28 June 2023

12 June 2023

10 March 2023

9 March 2023

21 February 2023

26 January 2023

25 January 2023

3 August 2022

  • curprev 21:3221:32, 3 August 2022DG Regio talk contribs 86,964 bytes +54,814 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 23,096 bytes +2,715 Created claim: summary (P836): Strategisches Ziel des Projekts ist es, die Sammlung und Behandlung von kommunalem Abwasser zu erhöhen und die Trinkwasserversorgung der Bevölkerung in den Gemeinden Vaslui, Barlad, Husi und Negresti sicherzustellen. Die Hauptziele des Projekts sind: Gewährleistung angemessener Wasser- und Abwasserdienstleistungen zu erschwinglichen Preisen; Gewährleistung einer angemessenen Trinkwasserqualität in allen städtischen Ballungsräumen; — Verbesserung...
  • curprev 07:4007:40, 1 December 2021DG Regio talk contribs 20,381 bytes +240 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:4314:43, 26 November 2021DG Regio talk contribs 20,141 bytes +2,647 Created claim: summary (P836): Obiectivul strategic al proiectului este cresterea nivelului de Colectare si epurare a apelor uzate urbane, precum si a gradului de Asigurare a alimentarii cu apa potabila a populatiei in localitatile din aglomerarile Vaslui, Barlad, Husi si Negresti. Principèle obiectivele specifice ale proiectului sunt: — Asigurarea unor servicii adecvate de apa si de canalizare, la tarife accesibile; — Asigurarea unei calitati adecvate apei potabile in toate...
  • curprev 09:5809:58, 26 November 2021DG Regio talk contribs 17,494 bytes +301 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021