Revision history of "Project phase extension and rehabilitation of water and wastewater infrastructure in Hunedoara county" (Q3095567)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 22:2622:26, 9 October 2024DG Regio talk contribs 117,029 bytes +32 Changed label, description and/or aliases in pt
  • curprev 22:2622:26, 9 October 2024DG Regio talk contribs 116,997 bytes +124 Set a claim value: summary (P836): O objetivo geral do projeto, a extensão e reabilitação das infraestruturas de abastecimento de água e de tratamento de águas residuais no distrito de Hunedoara, é melhorar as infraestruturas no setor da água e das águas residuais nas aglomerações de Deva, Hunedoara, Brad, Calan, Hateg e Simeria. O projeto visa realizar investimentos na extensão/reabilitação de infraestruturas de água potável e em infraestruturas de recolha e tratamento de águas resi...

26 June 2024

  • curprev 08:1808:18, 26 June 2024DG Regio talk contribs 116,873 bytes +469 Set a claim value: summary (P836): L’objectif général du projet, Extension and Rehabilitation of Water and Wastewater Infrastructure in Hunedoara County» est d’améliorer les infrastructures du secteur de l’eau et des eaux usées dans les agglomérations de Deva, Hunedoara, Brad, Calan, Hateg et Simeria. Le projet vise à réaliser des investissements dans l’extension/la réhabilitation des infrastructures d’eau potable et dans les infrastructures de collecte et de traitement des eaux usée...

5 June 2024

22 March 2024

28 June 2023

12 June 2023

10 March 2023

9 March 2023

21 February 2023

26 January 2023

25 January 2023

3 August 2022

  • curprev 21:3121:31, 3 August 2022DG Regio talk contribs 114,621 bytes +73,284 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:3807:38, 1 December 2021DG Regio talk contribs 28,799 bytes +3,614 Created claim: summary (P836): Das allgemeine Ziel des Projekts, die Erweiterung und Sanierung der Wasser- und Abwasserinfrastruktur in Hunedoara County" ist die Verbesserung der Infrastruktur im Wasser- und Abwassersektor in den Gemeinden Deva, Hunedoara, Brad, Calan, Hateg und Simeria. Das Projekt zielt darauf ab, Investitionen in den Ausbau/Rehabilitation der Trinkwasserinfrastruktur und in die Abwassersammel- und Abwasseraufbereitungsinfrastruktur wie folgt zu tätigen: Wa...
  • curprev 07:3807:38, 1 December 2021DG Regio talk contribs 25,185 bytes +140 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:3714:37, 26 November 2021DG Regio talk contribs 25,045 bytes +3,856 Created claim: summary (P836): Obiectivul general al proiectului, Extinderea si Reabilitarea Infrastructurii de apa si apa uzata in judetul Hunedoara" îl reprezintă îmbunătăirea Infrastructurii în sectorul de apă si apa uzata in aglomerarile Deva, Hunedoara, Brad, Calan, Hateg si Simeria. Proiectul are ca scop realizarea de investitii in extinderea/Reabilitarea Infrastructurii de apa potabila si in infrastructura de Colectare si epurare a apelor uzate, dupa cum urmeaza: — Ali...
  • curprev 09:5609:56, 26 November 2021DG Regio talk contribs 21,189 bytes +220 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

24 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021