Revision history of "Reconstruction of national regional road P30 Cēsis – Vecpiebalga – Madona (stage Vecpiebalga – Invaldnkalns) km 49.06-61.13" (Q3057633)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:4120:41, 3 August 2022DG Regio talk contribs 59,830 bytes +36,710 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 19,045 bytes +1,830 Created claim: summary (P836): Het doel van het project is de wederopbouw van de nationale regionale weg P30 Cēsis — Vecpiebalga — Madona (stadia Vecpiebalga — In...enkalns) km 49,06-61.13, die de bouw van een bestrating en de aankoop van grond omvat. Geplande totale duur van de uitvoering van het project 39 maanden. De totale kosten van het project bedragen 7 546 626,10 EUR, inclusief de geplande financiering van het Europees Fonds voor Regionale Ontwikkeling — 64 632,18 EUR...
  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 17,215 bytes +195 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 17,020 bytes +1,806 Created claim: summary (P836): Ziel des Projekts ist der Wiederaufbau der nationalen Regionalstraße P30 Cēsis – Vecpiebalga – Madona (Stufe Vecpiebalga – Inekalns) km 49,06-61,13, die den Bau eines Bürgersteigs und den Erwerb von Grundstücken umfasst. Geplante Gesamtdauer der Projektdurchführung 39 Monate. Die Gesamtkosten des Projekts belaufen sich auf 7 546 626,10 EUR, einschließlich der geplanten Finanzierung des Europäischen Fonds für regionale Entwicklung – 64 632,18 EUR...
  • curprev 09:3809:38, 28 November 2021DG Regio talk contribs 15,214 bytes +197 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 15,017 bytes +1,821 Created claim: summary (P836): L’objectif de ce projet est la reconstruction de la route nationale régionale P30 Cēsis — Vecpiebalga — Madona (étape Vecpiebalga — In’kalns) km 49,06-61.13, qui comprend la construction d’un trottoir et l’achat de terrains. Durée totale prévue de mise en œuvre du projet 39 mois. Le coût total du projet s’élève à 754 626,10 EUR, y compris le financement prévu du Fonds européen de développement régional — 64 632,18 EUR et le financement du budget...
  • curprev 20:3320:33, 25 November 2021DG Regio talk contribs 13,196 bytes +194 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 12,582 bytes +190 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 15 July 2021DG Regio talk contribs 12,392 bytes +1,742 Created claim: summary (P836): The aim of the project is reconstruction of the national regional road P30 Cēsis – Vecpiebalga – Madona (stage Vecpiebalga – Invaldnkalns) km 49.06-61.13, which includes construction of duvets and purchase of land. The total planned duration of the project is 39 months. The estimated total cost of the project is EUR 7546626,10, including the planned European Regional Development Fund funding – EUR 6 414632,18 and the state budget funding – EUR 1...

14 July 2021

13 July 2021