Revision history of "Development of water services in Dundaga round II" (Q3057395)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 June 2023

12 June 2023

3 August 2022

  • curprev 20:3320:33, 3 August 2022DG Regio talk contribs 49,234 bytes +30,148 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, lv, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, ga, sl, bg, mt, pt, da, ro, sv,

12 January 2022

11 January 2022

28 November 2021

  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 15,721 bytes +1,535 Created claim: summary (P836): Ontwikkeling en verbetering van de kwaliteit van de watervoorzienings- en rioleringsdiensten en het waarborgen van aansluitingsmogelijkheden, terwijl tegelijkertijd de kwaliteit van het milieu wordt verbeterd en de burgers worden voorzien van normatief drinkwater. De belangrijkste maatregelen zijn de aanleg van nieuwe rioleringsnetten 3,19 km, de bouw van een nieuwe rioleringspijp 0,81 km, de bouw van drie nieuwe rioleringen en een nieuw waterle...
  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 14,186 bytes +121 Changed label, description and/or aliases in nl: translated_label
  • curprev 09:3709:37, 28 November 2021DG Regio talk contribs 14,065 bytes +1,559 Created claim: summary (P836): Entwicklung und Verbesserung der Qualität der Wasserversorgungs- und Kanalisationsdienste und Gewährleistung von Anschlussmöglichkeiten bei gleichzeitiger Verbesserung der Umweltqualität und Versorgung der Bürger mit normativem Trinkwasser. Die wichtigsten Maßnahmen sind der Bau neuer Kanalisationsnetze 3,19 km, der Bau einer neuen Kanalisationsleitung 0,81 km, der Bau von drei neuen Kanalisationen und ein neues Wasserversorgungsnetz von 1,1 km....
  • curprev 09:3709:37, 28 November 2021DG Regio talk contribs 12,506 bytes +131 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 20:3120:31, 25 November 2021DG Regio talk contribs 12,375 bytes +1,594 Created claim: summary (P836): Développer et améliorer la qualité des services d’approvisionnement en eau et d’assainissement et assurer des possibilités de raccordement, tout en améliorant la qualité de l’environnement et en fournissant aux citoyens une eau potable normative. Les principales mesures sont la construction de nouveaux réseaux d’assainissement 3,19 km, la construction d’un nouveau tuyau d’égout de 0,81 km, la construction de trois nouveaux égouts et un nouveau r...
  • curprev 20:3120:31, 25 November 2021DG Regio talk contribs 10,781 bytes +132 Changed label, description and/or aliases in fr: translated_label

27 September 2021

10 September 2021

15 July 2021

  • curprev 12:4512:45, 15 July 2021DG Regio talk contribs 10,228 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4512:45, 15 July 2021DG Regio talk contribs 10,120 bytes +1,458 Created claim: summary (P836): Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km....

14 July 2021

13 July 2021