Revision history of "Redefinition of the treatment system of the Touriz sewage treatment plant" (Q2982886)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:5519:55, 3 August 2022DG Regio talk contribs 41,780 bytes +25,210 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5008:50, 9 July 2021DG Regio talk contribs 9,475 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1202:12, 9 July 2021DG Regio talk contribs 9,044 bytes +1,208 Created claim: summary (P836): The operation includes the implementation of an effective treatment solution for untreated waste water produced by the Touriz cluster, through the deep requalification of the Touriz treatment plant, resulting in the expansion of its capacity (600 inhab. eq.) and quality of treatment, conforming them to the dimensions of the subsystem and the requirements of the receiving environment., translated_summary
  • curprev 02:1202:12, 9 July 2021DG Regio talk contribs 7,836 bytes −1,208 Removed claim: summary (P836): The operation includes the implementation of an effective treatment solution for untreated waste water produced by the Touriz cluster, through the deep requalification of the Touriz treatment plant, resulting in the expansion of its capacity (600 inhab. eq.) and quality of treatment, conforming them to the dimensions of the subsystem and the requirements of the receiving environment., remove_old_english_translation
  • curprev 01:4401:44, 9 July 2021DG Regio talk contribs 9,044 bytes +132 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4401:44, 9 July 2021DG Regio talk contribs 8,912 bytes +1,208 Created claim: summary (P836): The operation includes the implementation of an effective treatment solution for untreated waste water produced by the Touriz cluster, through the deep requalification of the Touriz treatment plant, resulting in the expansion of its capacity (600 inhab. eq.) and quality of treatment, conforming them to the dimensions of the subsystem and the requirements of the receiving environment., translated_summary

8 July 2021

7 July 2021