Revision history of "Interventions in the Drainage Network of Wastewater in Baixa in the municipality of Baião (SAR Frende)" (Q2982671)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4919:49, 3 August 2022DG Regio talk contribs 43,520 bytes +26,285 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2808:28, 9 July 2021DG Regio talk contribs 9,577 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1102:11, 9 July 2021DG Regio talk contribs 9,146 bytes +1,262 Created claim: summary (P836): The operation aims to close down waste water drainage systems in the municipality of Baião, with a view to optimising the capacity installed in the SAR Frende and the extension of the service, by providing the service to approximately 133 inhabitants/80 accommodations, through the construction of 1.16 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 131,323.74., translat...
  • curprev 02:1102:11, 9 July 2021DG Regio talk contribs 7,884 bytes −1,262 Removed claim: summary (P836): The operation aims to close down waste water drainage systems in the municipality of Baião, with a view to optimising the capacity installed in the SAR Frende and the extension of the service, by providing the service to approximately 133 inhabitants/80 accommodations, through the construction of 1.16 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 131,323.74., remove...
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 9,146 bytes +163 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1002:10, 9 July 2021DG Regio talk contribs 8,983 bytes +1,262 Created claim: summary (P836): The operation aims to close down waste water drainage systems in the municipality of Baião, with a view to optimising the capacity installed in the SAR Frende and the extension of the service, by providing the service to approximately 133 inhabitants/80 accommodations, through the construction of 1.16 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 131,323.74., translat...

8 July 2021

7 July 2021