Revision history of "Remodeling of the Mourão SAR" (Q2982593)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4719:47, 3 August 2022DG Regio talk contribs 39,228 bytes +23,317 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,192 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 8,761 bytes +1,136 Created claim: summary (P836): With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão., translated_summary
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,625 bytes −1,136 Removed claim: summary (P836): With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão., remove_old_english_translation
  • curprev 02:0102:01, 9 July 2021DG Regio talk contribs 8,761 bytes +88 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0102:01, 9 July 2021DG Regio talk contribs 8,673 bytes +1,136 Created claim: summary (P836): With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão., translated_summary

8 July 2021

7 July 2021