Revision history of "Remodeling of the Manhose Seyxo SAR II" (Q2982592)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4719:47, 3 August 2022DG Regio talk contribs 38,435 bytes +22,788 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

16 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:3608:36, 9 July 2021DG Regio talk contribs 9,069 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 8,638 bytes +1,072 Created claim: summary (P836): This operation aims to provide the existing sewage plant with an entrance work to ensure the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 160 inhabitants of the parish of Seixo de Manhoses., translated_summary
  • curprev 02:0802:08, 9 July 2021DG Regio talk contribs 7,566 bytes −1,072 Removed claim: summary (P836): This operation aims to provide the existing sewage plant with an entrance work to ensure the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 160 inhabitants of the parish of Seixo de Manhoses., remove_old_english_translation
  • curprev 02:0102:01, 9 July 2021DG Regio talk contribs 8,638 bytes +97 Changed label, description and/or aliases in en: translated_label
  • curprev 02:0102:01, 9 July 2021DG Regio talk contribs 8,541 bytes +1,072 Created claim: summary (P836): This operation aims to provide the existing sewage plant with an entrance work to ensure the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 160 inhabitants of the parish of Seixo de Manhoses., translated_summary

8 July 2021

7 July 2021