Revision history of "Wastewater drainage of Bravães" (Q2982473)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:4419:44, 3 August 2022DG Regio talk contribs 39,577 bytes +23,565 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 08:2708:27, 9 July 2021DG Regio talk contribs 9,213 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 8,782 bytes +1,169 Created claim: summary (P836): The solution proposed in the Study of the Wastewater Sanitation Project in Bravães and Lavradas points to the division of the zone into three drainage basins.The effluents of the third alguidar should be integrated, by elevation, into the existing Oleiros network, which has as its final destination the current treatment plant of Ponte da Barca., translated_summary
  • curprev 02:0602:06, 9 July 2021DG Regio talk contribs 7,613 bytes −1,169 Removed claim: summary (P836): The solution proposed in the Study of the Wastewater Sanitation Project in Bravães and Lavradas points to the division of the zone into three drainage basins.The effluents of the third alguidar should be integrated, by elevation, into the existing Oleiros network, which has as its final destination the current treatment plant of Ponte da Barca., remove_old_english_translation
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 8,782 bytes +90 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5201:52, 9 July 2021DG Regio talk contribs 8,692 bytes +1,169 Created claim: summary (P836): The solution proposed in the Study of the Wastewater Sanitation Project in Bravães and Lavradas points to the division of the zone into three drainage basins.The effluents of the third alguidar should be integrated, by elevation, into the existing Oleiros network, which has as its final destination the current treatment plant of Ponte da Barca., translated_summary

8 July 2021

7 July 2021