Revision history of "Strategic Programme for Strengthening the Domestic Waste Water System – RARD Lot B (Part) and RARD Lot C (Part)" (Q2982261)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:3819:38, 3 August 2022DG Regio talk contribs 45,056 bytes +27,596 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:3908:39, 9 July 2021DG Regio talk contribs 9,607 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 9,176 bytes +1,295 Created claim: summary (P836): The implementation of these infrastructures will make it possible to increase the population served by the domestic waste water network (+ 835 inhabitants), as well as an increase in the number of housings (+ 442) to be used by the domestic waste water network, with a view to optimising the installed capacity and joining the service, the investment of which is in the implementation of the networks and connection to the high subsystem – North/Coi...
  • curprev 01:5701:57, 9 July 2021DG Regio talk contribs 7,881 bytes −1,295 Removed claim: summary (P836): The implementation of these infrastructures will make it possible to increase the population served by the domestic waste water network (+ 835 inhabitants), as well as an increase in the number of housings (+ 442) to be used by the domestic waste water network, with a view to optimising the installed capacity and joining the service, the investment of which is in the implementation of the networks and connection to the high subsystem – North/C...
  • curprev 01:3501:35, 9 July 2021DG Regio talk contribs 9,176 bytes +173 Changed label, description and/or aliases in en: translated_label
  • curprev 01:3501:35, 9 July 2021DG Regio talk contribs 9,003 bytes +1,295 Created claim: summary (P836): The implementation of these infrastructures will make it possible to increase the population served by the domestic waste water network (+ 835 inhabitants), as well as an increase in the number of housings (+ 442) to be used by the domestic waste water network, with a view to optimising the installed capacity and joining the service, the investment of which is in the implementation of the networks and connection to the high subsystem – North/Coi...

8 July 2021

7 July 2021