Revision history of "Interventions at the Chapa SAR (Daru)" (Q2982189)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

3 August 2022

  • curprev 19:3619:36, 3 August 2022DG Regio talk contribs 41,535 bytes +25,081 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

22 October 2021

15 September 2021

9 July 2021

  • curprev 09:0009:00, 9 July 2021DG Regio talk contribs 9,349 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5501:55, 9 July 2021DG Regio talk contribs 8,918 bytes +1,200 Created claim: summary (P836): This operation aims to reduce urban pollution in the water mass of Ribeira de Santa Natália, with a special focus on full compliance with Directive 91/271/EEC of 21-05-1991 on the Treatment of Urban Waste Water (Daru) through the construction of the Chapa sewage treatment plant as well as the installation of 3.03 Km of interceptor to connect to the existing system “low”., translated_summary
  • curprev 01:5501:55, 9 July 2021DG Regio talk contribs 7,718 bytes −1,200 Removed claim: summary (P836): This operation aims to reduce urban pollution in the water mass of Ribeira de Santa Natália, with a special focus on full compliance with Directive 91/271/EEC of 21-05-1991 on the Treatment of Urban Waste Water (Daru) through the construction of the Chapa sewage treatment plant as well as the installation of 3.03 Km of interceptor to connect to the existing system “low”., remove_old_english_translation
  • curprev 01:5501:55, 9 July 2021DG Regio talk contribs 8,918 bytes +96 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5501:55, 9 July 2021DG Regio talk contribs 8,822 bytes +1,200 Created claim: summary (P836): This operation aims to reduce urban pollution in the water mass of Ribeira de Santa Natália, with a special focus on full compliance with Directive 91/271/EEC of 21-05-1991 on the Treatment of Urban Waste Water (Daru) through the construction of the Chapa sewage treatment plant as well as the installation of 3.03 Km of interceptor to connect to the existing system “low”., translated_summary

8 July 2021

7 July 2021