Revision history of "Chancellery/Pedrógão Sanitation Subsystem" (Q2982013)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

23 May 2023

9 November 2022

3 August 2022

  • curprev 19:3119:31, 3 August 2022DG Regio talk contribs 40,771 bytes +24,652 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:2508:25, 9 July 2021DG Regio talk contribs 9,265 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 01:5101:51, 9 July 2021DG Regio talk contribs 8,834 bytes +1,168 Created claim: summary (P836): This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies., translated_summary
  • curprev 01:5101:51, 9 July 2021DG Regio talk contribs 7,666 bytes −1,168 Removed claim: summary (P836): This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies., remove_old_english_translation
  • curprev 01:0101:01, 9 July 2021DG Regio talk contribs 8,834 bytes +102 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0101:01, 9 July 2021DG Regio talk contribs 8,732 bytes +1,168 Created claim: summary (P836): This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies., translated_summary

8 July 2021

7 July 2021