Revision history of "Rehabilitation and Requalification of the Municipal Fire Department of Leiria" (Q2981617)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

10 June 2023

23 May 2023

5 November 2022

3 August 2022

  • curprev 19:2019:20, 3 August 2022DG Regio talk contribs 41,013 bytes +24,609 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

22 January 2022

18 January 2022

20 December 2021

15 December 2021

7 December 2021

21 October 2021

15 September 2021

9 July 2021

  • curprev 08:5208:52, 9 July 2021DG Regio talk contribs 9,409 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 8,978 bytes +1,209 Created claim: summary (P836): The headquarters of the Municipal Firefighters of Leiria, dated 1988, integrates the infrastructure network to strengthen operationality, and provides, within the scope of this operation, the rehabilitation and requalification of the barracks with a view to the refunctionalisation of the operational areas of the building and the improvement of the response capacity of the corporation., translated_summary
  • curprev 02:0702:07, 9 July 2021DG Regio talk contribs 7,769 bytes −1,209 Removed claim: summary (P836): The headquarters of the Municipal Firefighters of Leiria, dated 1988, integrates the infrastructure network to strengthen operationality, and provides, within the scope of this operation, the rehabilitation and requalification of the barracks with a view to the refunctionalisation of the operational areas of the building and the improvement of the response capacity of the corporation., remove_old_english_translation
  • curprev 01:4301:43, 9 July 2021DG Regio talk contribs 8,978 bytes +136 Changed label, description and/or aliases in en: translated_label
  • curprev 01:4301:43, 9 July 2021DG Regio talk contribs 8,842 bytes +1,209 Created claim: summary (P836): The headquarters of the Municipal Firefighters of Leiria, dated 1988, integrates the infrastructure network to strengthen operationality, and provides, within the scope of this operation, the rehabilitation and requalification of the barracks with a view to the refunctionalisation of the operational areas of the building and the improvement of the response capacity of the corporation., translated_summary

8 July 2021

7 July 2021