Revision history of "Infrastructure of the Logistics and Industrial Activities Zone of the Port of Aveiro (zali)" (Q2913361)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

12 June 2023

23 May 2023

9 November 2022

30 July 2022

  • curprev 02:3202:32, 30 July 2022DG Regio talk contribs 43,130 bytes +26,157 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

14 December 2021

6 December 2021

21 October 2021

14 September 2021

8 July 2021

  • curprev 13:0613:06, 8 July 2021DG Regio talk contribs 9,574 bytes +150 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0613:06, 8 July 2021DG Regio talk contribs 9,424 bytes +1,258 Created claim: summary (P836): The construction of the zali is located in a port expansion area. The implementation of the project involves, in addition to its technical implementation projects, the removal of the material deposited in the area of work, the dredging of the 1st establishment of the alguidar adjacent to its maritime front and the implementation of the infrastructure required for its operation, in particular road traffic routes and service networks., translated_...
  • curprev 10:3210:32, 8 July 2021DG Regio talk contribs 8,166 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021