Revision history of "Paru 4 – Rehabilitation of Mirandela railway station (upper floors)" (Q2895739)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

14 June 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 17:0617:06, 29 July 2022DG Regio talk contribs 43,299 bytes +26,346 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:0707:07, 8 July 2021DG Regio talk contribs 9,487 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0707:07, 8 July 2021DG Regio talk contribs 9,359 bytes +1,236 Created claim: summary (P836): The proposal presents with the main strategy, the rehabilitation and conservation of a building, historically emblematic, and with an architectural language, specific to a long period of time, where it was adapted to serve various functions, within what was its main design-a Railway Station, to serve the populations of Mirandela and bring economic development and accessibility to a geographically remote region., translated_summary
  • curprev 00:4600:46, 8 July 2021DG Regio talk contribs 8,123 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021