Revision history of "Qualification of the public space on the right bank of the River Tâmega, between the Jardim do Tabolado and the São Roque Bridge (paru 2.7)" (Q2895653)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

10 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 17:0417:04, 29 July 2022DG Regio talk contribs 44,511 bytes +27,124 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:2107:21, 8 July 2021DG Regio talk contribs 9,641 bytes +1,272 Created claim: summary (P836): This operation substantiates the reorganisation of public spaces, on the right bank of the River Tâmega, between the garden of the Tabolado and the bridge of S. Roque. The intervention area (13,644 m²) aims to boost this space and the relationship between the historical center, the River Tâmega and the new contemporary art museum Nadir Afonso, thus completing the project of urban requalification initiated within the scope of the project Polis.,...
  • curprev 07:2107:21, 8 July 2021DG Regio talk contribs 8,369 bytes −1,272 Removed claim: summary (P836): This operation substantiates the reorganisation of public spaces, on the right bank of the River Tâmega, between the garden of the Tabolado and the bridge of S. Roque. The intervention area (13,644 m²) aims to boost this space and the relationship between the historical center, the River Tâmega and the new contemporary art museum Nadir Afonso, thus completing the project of urban requalification initiated within the scope of the project Polis....
  • curprev 07:0607:06, 8 July 2021DG Regio talk contribs 9,641 bytes +201 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0607:06, 8 July 2021DG Regio talk contribs 9,440 bytes +1,272 Created claim: summary (P836): This operation substantiates the reorganisation of public spaces, on the right bank of the River Tâmega, between the garden of the Tabolado and the bridge of S. Roque. The intervention area (13,644 m²) aims to boost this space and the relationship between the historical center, the River Tâmega and the new contemporary art museum Nadir Afonso, thus completing the project of urban requalification initiated within the scope of the project Polis.,...
  • curprev 00:4900:49, 8 July 2021DG Regio talk contribs 8,168 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021