Revision history of "Project of reprofiling Manuel Tomás Street" (Q2895355)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

10 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 16:5516:55, 29 July 2022DG Regio talk contribs 40,241 bytes +24,091 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

21 January 2022

17 January 2022

19 December 2021

13 December 2021

5 December 2021

21 October 2021

13 September 2021

8 July 2021

  • curprev 07:1707:17, 8 July 2021DG Regio talk contribs 9,275 bytes +1,171 Created claim: summary (P836): The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles., translated_summary
  • curprev 07:1707:17, 8 July 2021DG Regio talk contribs 8,104 bytes −1,171 Removed claim: summary (P836): The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles., remove_old_english_translation
  • curprev 07:0207:02, 8 July 2021DG Regio talk contribs 9,275 bytes +102 Changed label, description and/or aliases in en: translated_label
  • curprev 07:0207:02, 8 July 2021DG Regio talk contribs 9,173 bytes +1,171 Created claim: summary (P836): The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles., translated_summary
  • curprev 00:4300:43, 8 July 2021DG Regio talk contribs 8,002 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string

7 July 2021

6 July 2021