Revision history of "INSTALLATION OF THYMAINE WASTE WATER TREATMENT UNIT" (Q2821564)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 09:2409:24, 9 October 2024DG Regio talk contribs 41,261 bytes +7 Changed label, description and/or aliases in pt
  • curprev 09:2409:24, 9 October 2024DG Regio talk contribs 41,254 bytes −2 Set a claim value: summary (P836): O objetivo do projeto é a melhoria do tratamento de águas residuais na ilha de Tomena, no município de Fourni Korseon, com a construção de uma instalação de tratamento de águas residuais (EEL). A conclusão dos projectos planeados de tratamento e eliminação segura de águas residuais com tratamento superior contribuirá decisivamente para a plena protecção da zona costeira e do ambiente costeiro de Fourni Korseon.

22 March 2024

11 June 2023

11 July 2022

  • curprev 14:1714:17, 11 July 2022DG Regio talk contribs 40,531 bytes +24,732 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

17 December 2021

7 December 2021

30 November 2021

  • curprev 13:0713:07, 30 November 2021DG Regio talk contribs 10,393 bytes +1,263 Created claim: summary (P836): L’objectif du projet est d’améliorer le traitement des eaux usées, sur l’île de Thymeina, dans la municipalité de Fourna Korseia, par la construction d’une installation de traitement des eaux usées. L’achèvement du traitement prévu et l’élimination sûre des eaux usées traitées tertiaire contribueront de manière décisive à la protection totale de la zone côtière et de l’environnement côtier de Fourni Korses., translated_summary
  • curprev 13:0713:07, 30 November 2021DG Regio talk contribs 9,130 bytes +125 Changed label, description and/or aliases in fr: translated_label

27 September 2021

6 July 2021

5 July 2021

  • curprev 18:4118:41, 5 July 2021DG Regio talk contribs 8,994 bytes +110 Changed label, description and/or aliases in en: translated_label
  • curprev 18:4118:41, 5 July 2021DG Regio talk contribs 8,884 bytes +1,226 Created claim: summary (P836): The aim of the project is the improvement of waste water treatment on the island of Thymena of the Municipality of Fourni Korseon, with the construction of a sewage treatment facility (EEL). The completion of the planned treatment and safe disposal projects of higher-treated waste water will contribute decisively to the full protection of the coastal area and the coastal environment of Fourni Korseon., translated_summary

1 July 2021