Revision history of "New Port of Patras 3rd Phase A Department" (Q2791650)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

9 June 2023

11 July 2022

  • curprev 09:0109:01, 11 July 2022DG Regio talk contribs 61,363 bytes +35,072 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 19:3319:33, 29 November 2021DG Regio talk contribs 15,665 bytes +3,403 Created claim: summary (P836): Le projet global concerne la construction de la 3ème section de la première phase de développement du nouveau port de Patras. Le projet est «ERGO-PHASING» entre le NSRF 2007-2013 et le NSRF 2014-2020 et est mis en œuvre en deux phases distinctes (phase A1 et phase A2). Ce projet concerne la phase A2 du projet et comprend: les travaux de construction du 5e quai de transbordeurs, d’une longueur totale de 219,10 m de longueur de 29,43 %, les travau...
  • curprev 19:3319:33, 29 November 2021DG Regio talk contribs 12,262 bytes +93 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

3 July 2021

  • curprev 01:0501:05, 3 July 2021DG Regio talk contribs 12,158 bytes +100 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0501:05, 3 July 2021DG Regio talk contribs 12,058 bytes +1,842 Created claim: summary (P836): The overall project concerns the construction of the 3rd part of Phase of the New Port of Patras. The project is “ERGO-phasing” between NSRF 2007-2013 and NSRF 2014-2020 and is implemented in two distinct phases (Phase A1΄ and Phase A2').This project concerns Phase A2΄ of the project and includes: construction work of the 5th vessel vessel, the total length of the building 219.10 m in percentage 29.43 %, construction works of 210 m length, 16,67...

1 July 2021