Revision history of "Upgrading DJ 126, Km 0+ 000-5+ 650" (Q2746870)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 48,656 bytes +4 Changed label, description and/or aliases in pt
  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 48,652 bytes +19 Set a claim value: summary (P836): O objetivo geral do projeto é modernizar o sistema rodoviário em DJ 126 Voșlăbeni-Lăzarea, a fim de melhorar os parâmetros pertinentes – aumentar a velocidade da estrada, aumentar a segurança rodoviária e a portabilidade no setor entre o km 0+ 000 e o km 5+ 650, o que garante a conectividade com a parte centro-oriental do distrito de Harghita, passando pelos distritos de Brasov e Covasna, com o corredor RTE-T, com as estradas nacionais DN12 (E578) e...

26 June 2024

  • curprev 08:1408:14, 26 June 2024DG Regio talk contribs 48,633 bytes +3 Set a claim value: summary (P836): L’objectif général du projet est de moderniser le système routier sur DJ 126 Voșlăbeni-Lăzarea, afin d’améliorer les paramètres pertinents — augmenter la vitesse de course, augmenter la sécurité routière et la remontée sur le secteur entre les km 0+ 000 et km 5+ 650, ce qui assure la connectivité avec la partie centrale-est du comté d’Harghita, en passant par les comtés de Brasov et de Covasna, avec le corridor TEN-T, avec les routes nationales DN12...

5 June 2024

20 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 08:0608:06, 28 July 2022DG Regio talk contribs 48,866 bytes +27,761 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:3407:34, 1 December 2021DG Regio talk contribs 16,638 bytes +1,425 Created claim: summary (P836): Allgemeines Ziel des Projekts ist es, das Straßensystem auf DJ 126 Voșlăbeni-Lăzarea zu modernisieren, um die relevanten Parameter zu verbessern – die Geschwindigkeit der Straße zu erhöhen, die Straßenverkehrssicherheit und den Hafen im Sektor zwischen km 0+ 000 und km 5+ 650 zu erhöhen, was die Anbindung an den mittelöstlichen Teil der Grafschaft Harghita gewährleistet, die durch die Grafschaften Brasov und Covasna mit dem TEN-V-Korridor mit de...
  • curprev 07:3407:34, 1 December 2021DG Regio talk contribs 15,213 bytes +93 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:3514:35, 26 November 2021DG Regio talk contribs 15,120 bytes +1,392 Created claim: summary (P836): Obiectivul general al proiectului constă în modernizarea Sistemului rutier pe DJ 126 Voșlăbeni-Lăzarea, în Scopul îmbunătățirii parametrilor relevanți — creșterea vitezei de rulare, creșterea siguranței rutiere și a portanței pe sectorul cuprins între km 0+ 000 și km 5+ 650, Care asigură conectivitatea cu partea de centru-est a Județului Harghita, trecând prin județele Brașov și Covasna, cu Coridorul TEN-T, cu drumurile naționale DN12 (E578), re...
  • curprev 09:5109:51, 26 November 2021DG Regio talk contribs 13,728 bytes +100 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

16 September 2021

  • curprev 10:1910:19, 16 September 2021DG Regio talk contribs 11,920 bytes +1,377 Created claim: summary (P836): The general objective of the project is to modernise the road system on DJ 126 Voșlăbeni-Lăzarea, in order to improve the relevant parameters – to increase the speed of the road, to increase road safety and portance in the sector between km 0+ 000 and km 5+ 650, which ensures connectivity with the centre-eastern part of Harghita County, passing through the counties of Brasov and Covasna, with the TEN-T corridor, with the national roads DN12 (E57...

15 September 2021

14 September 2021

21 June 2021

17 June 2021

15 June 2021