Revision history of "Reconstruction and construction of port infrastructure at the City of Zadar — Plusan Island" (Q2734706)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 19:2319:23, 7 October 2024DG Regio talk contribs 54,700 bytes +3 Changed label, description and/or aliases in pt
  • curprev 19:2319:23, 7 October 2024DG Regio talk contribs 54,697 bytes +25 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução e modernização do Rei, Petra Krešimira IV, no porto de Zadar — Polusja, e assegurar a manutenção regular e segura do transporte marítimo costeiro regular entre Zadar e as ilhas circundantes. O valor total do projecto é de 67 489 388,11 HRK e os custos elegíveis são 66 608 138,11 HRK. Os custos inelegíveis ascendem a 881,250,00 HRK e dizem respeito ao fornecimento e instalação de amortecedores para o cais («boda...

12 August 2024

7 March 2024

11 June 2023

1 June 2023

12 October 2022

28 July 2022

  • curprev 04:5904:59, 28 July 2022DG Regio talk contribs 54,528 bytes +32,414 Changed label, description and/or aliases in et, lt, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, hr, nl, fr, de, it, es, and other parts: Adding translations: et, lt, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:1320:13, 29 November 2021DG Regio talk contribs 16,603 bytes +1,765 Created claim: summary (P836): Ziel des Projekts ist es, die Küste von König Petar Krešimir IV, dem betreffenden Pier und der liburnischen Küste im Bereich des Hafens Zadar – Halbinsel, zu rekonstruieren und zu verbessern und die Bedingungen für eine regelmäßige und sichere Erhaltung des küstennahen Linienverkehrs zwischen Zadar und den umliegenden Inseln zu gewährleisten. Der Gesamtwert des Projekts beträgt 67.489.388.11 HRK, und die förderfähigen Kosten betragen 66.608.138....
  • curprev 20:1320:13, 29 November 2021DG Regio talk contribs 14,838 bytes +128 Changed label, description and/or aliases in de: translated_label
  • curprev 10:2910:29, 29 November 2021DG Regio talk contribs 14,710 bytes +1,726 Created claim: summary (P836): L’objectif du projet est de reconstruire et de moderniser la côte du roi Petar Krešimir IV, la jetée en question et la côte Liburnienne, dans la zone du port Zadar — Péninsule, et d’assurer les conditions d’entretien régulier et sûr du trafic maritime côtier régulier entre Zadar et les îles environnantes. La valeur totale du projet est de 67.489.388,11 HRK, et les coûts admissibles sont de 66 608 138,11 kn. Les coûts inéligibles s’élèvent à 881 ...

26 November 2021

21 June 2021

3 June 2021

  • curprev 13:2113:21, 3 June 2021DG Regio talk contribs 12,403 bytes +152 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2113:21, 3 June 2021DG Regio talk contribs 12,251 bytes +1,562 Created claim: summary (P836): The aim of the project is the reconstruction and upgrading of the King, Petra Krešimira IV, at the port of Zadar — Polusja, and to ensure the regular and safe maintenance of scheduled coastal maritime transport between Zadar and the surrounding islands. The total value of the project is HRK 67.489.388,11 and the eligible costs are HRK 66.608.138,11. The ineligible costs amount to HRK 881.250,00 and relate to the supply and installation of buffer...

2 June 2021