Revision history of "Adaptation of Olsztyn-Mazury airport infrastructure to ILS category II" (Q2717401)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 21:4221:42, 2 March 2023DG Regio talk contribs 84,455 bytes +2,280 Changed label, description and/or aliases in da, lv, it, sk, hr, de, fi, fr, et, ro, sl, sv, pt, ga, es, lt, hu, bg, el, cs, nl, mt, and other parts

25 October 2022

24 October 2022

10 July 2022

  • curprev 21:1721:17, 10 July 2022DG Regio talk contribs 80,487 bytes +51,447 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5701:57, 8 July 2021DG Regio talk contribs 13,790 bytes +129 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5701:57, 8 July 2021DG Regio talk contribs 13,661 bytes +2,761 Created claim: summary (P836): The subject matter of the project is: I. Preparatory phase: —selection of the contract engineer -choice of the contractor for works II. Construction phase: —alignment of the area of the closed part of the belt -construction of “underground” overrun surfaces – construction of pavement of pavement with levelling of the ground and leveling of the foundations -construction of the building at the transformer station – demolition of the foundation of...

22 May 2021

21 May 2021