Revision history of "Reconstruction of the waste water treatment plant in Pogwizdowo" (Q2713393)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

10 July 2022

  • curprev 19:4719:47, 10 July 2022DG Regio talk contribs 53,266 bytes +32,457 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:3623:36, 7 July 2021DG Regio talk contribs 11,278 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 23:3623:36, 7 July 2021DG Regio talk contribs 11,156 bytes +1,626 Created claim: summary (P836): The project includes the extension of the waste water treatment plant in the Agglomeration of Pogwizdów in Hażlach. The project provided for the construction of a new technological pipeline, which is a necessary complement to the existing waste water treatment system, the installation of new mechanical and technological equipment, the introduction of improvements to the control system of the pumping station supplying the treatment plant, a syste...

21 May 2021