Revision history of "Extension and reconstruction of the waste water treatment plant in Kcynia – stage I" (Q2699231)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:1308:13, 9 October 2024DG Regio talk contribs 80,958 bytes −11 Changed label, description and/or aliases in pt
  • curprev 08:1308:13, 9 October 2024DG Regio talk contribs 80,969 bytes +104 Set a claim value: summary (P836): O projecto previsto tem por objecto a primeira fase da ampliação e reconstrução da estação de tratamento de águas residuais da cidade de Kcynia. A execução do projeto contribuirá para aumentar a população utilizando um sistema melhorado de tratamento de águas residuais em conformidade com a Diretiva Águas Residuais Urbanas, o que é coerente com o objetivo da medida 4.3 do POR 2014-2020. O principal problema deste projecto é o estado técnico insufici...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:5920:59, 2 March 2023DG Regio talk contribs 78,042 bytes −2,626 Changed label, description and/or aliases in da, it, sk, fi, cs, lv, de, ga, sv, bg, el, pt, ro, et, sl, hu, nl, fr, lt, hr, es, mt, and other parts

21 October 2022

28 July 2022

  • curprev 01:1401:14, 28 July 2022DG Regio talk contribs 79,845 bytes +51,647 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:2117:21, 7 July 2021DG Regio talk contribs 13,383 bytes +144 Changed label, description and/or aliases in en: translated_label
  • curprev 17:2117:21, 7 July 2021DG Regio talk contribs 13,239 bytes +2,581 Created claim: summary (P836): The subject of the planned project is the first phase of the extension and reconstruction of the waste water treatment plant in the city of Kcynia. The implementation of the project will contribute to increasing the population using an improved waste water treatment system in accordance with the Urban Waste Water Directive, which is consistent with the objective of measure 4.3 of the 2014-2020 ROP. The main problem with regard to this project is...

21 May 2021