Revision history of "Building modifications and reduction of energy performance of the building no. p. 2347, Rakovník" (Q16174)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 48,393 bytes −4 Changed label, description and/or aliases in pt
  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 48,397 bytes −6 Set a claim value: summary (P836): A intenção do investidor é isolar de forma abrangente o edifício, incluindo a substituição de enchimentos de orifícios para cumprir os atuais requisitos e normas técnico-térmicos. As modificações também incluirão a reconstrução da iluminação artificial, instalação de equipamentos de ventilação e fonte de calor. A razão para as modificações de construção é reduzir o desempenho energético do edifício.

23 March 2024

15 January 2024

11 June 2023

17 February 2023

27 July 2022

  • curprev 18:4318:43, 27 July 2022DG Regio talk contribs 44,707 bytes +25,878 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5509:55, 2 December 2021DG Regio talk contribs 14,562 bytes +1,245 Created claim: summary (P836): Der Investor beabsichtigt die komplexe Isolierung des Gebäudes, einschließlich des Austauschs von Lochfüllungen, um den aktuellen thermischen und technischen Anforderungen und Standards gerecht zu werden. Die Änderungen umfassen auch die Rekonstruktion der künstlichen Beleuchtung, die Installation von Klimaanlagen und Wärmequelle. Der Grund für die Bauarbeiten ist die Reduzierung der Energieeffizienz des Gebäudes., translated_summary
  • curprev 09:5509:55, 2 December 2021DG Regio talk contribs 13,317 bytes +138 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 13,179 bytes +1,293 Created claim: summary (P836): L’intention de l’investisseur est l’isolation complexe du bâtiment, y compris le remplacement des remplissages de trous, afin de répondre aux exigences et aux normes thermiques et techniques actuelles. Les modifications porteront également sur la reconstruction de l’éclairage artificiel, l’installation d’équipements de climatisation et de source de chaleur. La raison des travaux de construction est de réduire la performance énergétique du bâtime...
  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 11,886 bytes +167 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 12,168 bytes +1,227 Created claim: summary (P836): The investor’s intention is to comprehensively insulate the building including the replacement of hole fillings to meet current thermal-technical requirements and standards. The modifications will also include reconstruction of artificial lighting, installation of ventilation equipment and heat source. The reason for the construction modifications is to reduce the energy performance of the building. a., translated_summary
  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 10,941 bytes −806 Removed claim: summary (P836): The investor’s intention is the comprehensive insulation of the object, including replacement of the replacement of the building, to comply with current thermal requirements and standards. The adaptation shall include the reconstruction of artificial lighting, the installation of air-technical equipment and heat sources. The reason for carrying out the construction work is the improvement of the energy performance of the object., remove_old_en...
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 11,747 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 11,591 bytes −151 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:1611:16, 25 February 2020DG Regio talk contribs 10,475 bytes +806 Created claim: summary (P836): The investor’s intention is the comprehensive insulation of the object, including replacement of the replacement of the building, to comply with current thermal requirements and standards. The adaptation shall include the reconstruction of artificial lighting, the installation of air-technical equipment and heat sources. The reason for carrying out the construction work is the improvement of the energy performance of the object., Adding English...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020