Revision history of "Seaside resort Świnoujście – a new vision of public space – Construction of health promenade" (Q138012)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 79,060 bytes +12 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 79,048 bytes −114 Set a claim value: summary (P836): O projeto tem por objeto a construção de um passeio sanitário no distrito costeiro de Świnoujście. E a etapa do investimento foi preparar a documentação técnica necessária. A segunda etapa é a gestão ambiental e a obtenção de uma licença de construção. A terceira etapa é a construção. O passeio recém-formado (de ul. O WLKP Uprising to Małachowski incluirá, entre outros, uma caminhada, um percurso de rolos e uma ciclovia. 950 m de largura. 5 m para p...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3420:34, 2 March 2023DG Regio talk contribs 75,988 bytes +1,558 Changed label, description and/or aliases in lv, da, it, sk, et, fi, fr, ga, ro, sv, bg, el, hu, de, cs, sl, es, mt, lt, pt, hr, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:2401:24, 3 July 2022DG Regio talk contribs 72,316 bytes +45,928 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 15,984 bytes +2,614 Created claim: summary (P836): L’objet du projet est la construction d’une promenade sanitaire dans le quartier balnéaire de Świnoujście. La première étape de l’investissement a consisté à préparer la documentation technique nécessaire. L’étape II est la procédure environnementale et l’obtention du permis de construire. La troisième étape est celle des travaux de construction. Promenade nouvellement établie (à partir de ul. Les insurgés WLKP à Małachowski) incluront, entre au...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 13,370 bytes +182 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 13,627 bytes +157 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 13,470 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 13,633 bytes +2,254 Created claim: summary (P836): The subject of the project is the construction of a health promenade in the coastal district of Świnoujście. And the stage of the investment was to prepare the necessary tech documentation. The second stage is environmental management and obtaining a construction permit. The third stage is construction work. The newly formed promenade (from ul. The WLKP Uprising to Małachowski will include, among others, a walk, a roller path and a cycle path. 9...
  • curprev 19:4819:48, 21 October 2020DG Regio talk contribs 11,379 bytes −1,840 Removed claim: summary (P836): The project is the construction of a health promenade in the coastal district of Świnoujście. And the investment stage was the preparation of the necessary tech dossier. Stage II is the environmental process and the obtaining of a building permit. Phase III works. The newly formed Promenada (from ul. In WLKP for Małachowski WLKP, it will include, inter alia, a pushchair, a roller path and a cycle path. 950 m, six. 5 m for the pedestrian, 3 m w...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1010:10, 11 March 2020DG Regio talk contribs 11,925 bytes +1,840 Created claim: summary (P836): The project is the construction of a health promenade in the coastal district of Świnoujście. And the investment stage was the preparation of the necessary tech dossier. Stage II is the environmental process and the obtaining of a building permit. Phase III works. The newly formed Promenada (from ul. In WLKP for Małachowski WLKP, it will include, inter alia, a pushchair, a roller path and a cycle path. 950 m, six. 5 m for the pedestrian, 3 m wit...

25 February 2020

18 February 2020

31 January 2020

14 January 2020