Revision history of "Construction of the Western Promenade in Dziwnów" (Q138010)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 59,938 bytes +8 Changed label, description and/or aliases in pt
  • curprev 18:3018:30, 9 October 2024DG Regio talk contribs 59,930 bytes −15 Set a claim value: summary (P836): O objecto do projecto é a construção de um turismo activo, que é uma parte atractiva do produto turístico e da rota de ciclismo Bike the Baltic.O projecto consiste na construção da secção ocidental do passeio marítimo em Dziwnów, juntamente com travessias na rua Przymora e na rua Osiedle Rybackie. As fases mais importantes do projeto são: TRABALHOS PREPARATÓRIOS: desenvolvimento da documentação do projecto; Elaboração de um estudo de viabilidade; de...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:2401:24, 3 July 2022DG Regio talk contribs 55,362 bytes +34,150 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 13,777 bytes +1,814 Created claim: summary (P836): L’objet du projet est la construction d’un tourisme actif, une partie attrayante du produit touristique Bike the Baltic. Le projet consiste en la construction de la partie ouest de la promenade à Dziwnów, ainsi que des passages de la rue Przymorze et de la rue Osiedle Rybackie. Les étapes les plus importantes du projet sont les suivantes: TRAVAUX PRÉPARATOIRES: préparation de la documentation du projet; élaboration d’une étude de faisabilité; él...
  • curprev 22:0722:07, 2 December 2021DG Regio talk contribs 11,963 bytes +111 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4719:47, 21 October 2020DG Regio talk contribs 12,291 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4719:47, 21 October 2020DG Regio talk contribs 12,183 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4719:47, 21 October 2020DG Regio talk contribs 12,289 bytes +1,718 Created claim: summary (P836): The subject of the project is the construction of an infr. active tourism which is an attractive part of the tourism product and cycling route Bike the Baltic.The project consists of the construction of the western section of the promenade in Dziwnów, along with crossings at Przymora Street and Osiedle Rybackie Street. The most important stages of the project are: PREPARATORY WORK: developing project documentation; drawing up a feasibility study...
  • curprev 19:4719:47, 21 October 2020DG Regio talk contribs 10,571 bytes −1,098 Removed claim: summary (P836): The project is a project building an attractive tourist destination, an attractive part of the tourist route to the bike the Baltic.Project, consists of the construction of a western stretch of the promenade in Dziwnów along with the passage at ul. Przysea and ul.Osiedle Fisheries. The main phases of the project are: PREPARATORY WORKS: development of project documentation; development of a feasibility study; drawing up a concept for the use of...

25 September 2020

24 September 2020

11 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1010:10, 11 March 2020DG Regio talk contribs 10,379 bytes +1,098 Created claim: summary (P836): The project is a project building an attractive tourist destination, an attractive part of the tourist route to the bike the Baltic.Project, consists of the construction of a western stretch of the promenade in Dziwnów along with the passage at ul. Przysea and ul.Osiedle Fisheries. The main phases of the project are: PREPARATORY WORKS: development of project documentation; development of a feasibility study; drawing up a concept for the use of a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020