Revision history of "Demolition of the existing and construction of the new Water Treatment Station in Pełczyce and the construction of sections of the water supply network together with the switching of existing water supply connections at ul. Pioneers and Starogrodzka in t" (Q137898)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 86,483 bytes +21 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 7 October 2024DG Regio talk contribs 86,462 bytes −25 Set a claim value: summary (P836): O projeto tem por objeto a modernização da estação de tratamento de água de Pełczyce e a modernização de troços da rede de abastecimento de água, bem como a mudança das ligações de abastecimento de água existentes em ul. Pioneiros e Starogrodzka na cidade de Pełczyce e nas aldeias de Sarnik, Jagów e Będargowo na comuna de Pełczyce. As atividades relacionadas com a estação de tratamento de água em Pełczyce incluem a demolição da estação de tratamento...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:4021:40, 2 March 2023DG Regio talk contribs 83,313 bytes +1,141 Changed label, description and/or aliases in sk, it, da, el, sv, ro, hu, fi, lv, fr, cs, ga, et, pt, lt, es, mt, nl, hr, de, sl, bg, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:1801:18, 3 July 2022DG Regio talk contribs 80,048 bytes +51,401 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 16,994 bytes +2,606 Created claim: summary (P836): L’objet du projet est la modernisation de la station de traitement de l’eau de Pełczyce et la modernisation de tronçons du réseau d’approvisionnement en eau ainsi que le passage aux réseaux d’alimentation en eau existants à ul. Pionniers et Starogrodzka dans la ville de Pełczyce et dans les villages de Sarnik, Jagów et Będargowo dans la municipalité de Pełczyce. Les activités liées à la station d’épuration de Pełczyce couvrent la démolition de l...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 14,388 bytes +456 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,371 bytes +402 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 13,969 bytes −350 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 14,319 bytes +2,479 Created claim: summary (P836): The subject of the project is the modernisation of the Water Treatment Station in Pełczyce and the modernisation of sections of the water supply network together with the switching of existing water supply connections at ul. Pioneers and Starogrodzka in the town of Pełczyce and in Sarnik, Jagów and Będargowo villages in Pełczyce commune. Activities related to the water treatment station in Pełczyce include demolition of the existing water treatm...
  • curprev 19:3719:37, 21 October 2020DG Regio talk contribs 11,840 bytes −1,975 Removed claim: summary (P836): The object of the project is the modernisation of the Water Treatment Station in Full and the modernisation of sections of the water supply network with the connection of existing water supply connections at ul. Pioneers in the town of Full and Sarnik, Jagów and Będargowo in the municipality of Rezyczyce. The activities related to the water treatment plant in Full shall cover the demolition of the existing water treatment plant and the constru...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1410:14, 11 March 2020DG Regio talk contribs 12,531 bytes +1,975 Created claim: summary (P836): The object of the project is the modernisation of the Water Treatment Station in Full and the modernisation of sections of the water supply network with the connection of existing water supply connections at ul. Pioneers in the town of Full and Sarnik, Jagów and Będargowo in the municipality of Rezyczyce. The activities related to the water treatment plant in Full shall cover the demolition of the existing water treatment plant and the construct...

25 February 2020

18 February 2020

31 January 2020

14 January 2020