Revision history of "Modernisation of the hydroelectric power plant in Borów" (Q137696)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 92,523 bytes +1 Changed label, description and/or aliases in pt
  • curprev 04:1804:18, 11 October 2024DG Regio talk contribs 92,522 bytes −29 Set a claim value: summary (P836): O principal objetivo deste projeto é aumentar o volume de eletricidade produzida na central hidroelétrica de Borowo em cerca de 757,58 MWh/ano. A tarefa traduzir-se-á, entre outras coisas, em evitar emissões de dióxido de carbono de quase 630 toneladas por ano, bem como outras substâncias nocivas emitidas para a atmosfera por centrais elétricas convencionais. O objeto da modernização da EW Borowo é equipar a instalação com uma turbina de água adicio...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:2918:29, 27 July 2022DG Regio talk contribs 85,343 bytes +55,448 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 17,445 bytes +3,189 Created claim: summary (P836): L’objectif principal de ce projet est d’augmenter le volume d’électricité généré par la centrale hydroélectrique de Borowo d’env. 757,58 MWh/an. La mise en œuvre de cette tâche permettra, entre autres, d’éviter des émissions de dioxyde de carbone de près de 630 tonnes par an, ainsi que d’autres substances nocives émises dans l’atmosphère par les centrales électriques conventionnelles. L’objectif de la modernisation d’EW Borowo est de doter l’ins...
  • curprev 21:2721:27, 2 December 2021DG Regio talk contribs 14,256 bytes +114 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,581 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,466 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 14,572 bytes +2,838 Created claim: summary (P836): The main objective of this Project is to increase the volume of electricity produced in the Borowo hydroelectric power plant by approx. 757,58 MWh/year. The task will translate, among other things, into avoiding carbon dioxide emissions of nearly 630 tonnes per year, as well as other harmful substances emitted into the atmosphere by conventional power plants. The subject of modernisation of EW Borowo is to equip the facility with an additional,...
  • curprev 19:0919:09, 21 October 2020DG Regio talk contribs 11,734 bytes −2,292 Removed claim: summary (P836): The main objective of this project is to increase the volume of electricity generated from the Borowo water power plant. 757.58 MWh/year. Implementation of the task will, inter alia, avoid carbon dioxide emissions of nearly 630 tonnes per year, as well as other harmful substances emitted into the atmosphere by conventional power plants. The purpose of the upgrade of EW is to equip the object with an additional high efficiency water turbine wit...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:0510:05, 11 March 2020DG Regio talk contribs 12,738 bytes +2,292 Created claim: summary (P836): The main objective of this project is to increase the volume of electricity generated from the Borowo water power plant. 757.58 MWh/year. Implementation of the task will, inter alia, avoid carbon dioxide emissions of nearly 630 tonnes per year, as well as other harmful substances emitted into the atmosphere by conventional power plants. The purpose of the upgrade of EW is to equip the object with an additional high efficiency water turbine with...

25 February 2020

18 February 2020

31 January 2020

14 January 2020