Revision history of "Establishment and armament of a business activity zone" (Q137468)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3118:31, 9 October 2024DG Regio talk contribs 80,066 bytes −16 Set a claim value: summary (P836): O escopo do projeto inclui a criação de uma zona de atividade empresarial no distrito de Świdwinski para as necessidades dos investidores privados. Como parte do projeto, está prevista a preparação de documentação técnica relativa ao armamento abrangente da zona. A divisão planeada da zona (direcionalmente) em 6 a 12 parcelas com a possibilidade de fusão ou divisão. O projeto será executado numa fórmula de conceção e construção. O requerente tencion...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 00:4200:42, 3 July 2022DG Regio talk contribs 73,896 bytes +47,182 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 21:1321:13, 2 December 2021DG Regio talk contribs 16,075 bytes +2,668 Created claim: summary (P836): Le champ d’application matériel du projet comprend la création d’une zone d’activité commerciale à Powiecie Świdwiński pour les besoins des investisseurs privés. Dans le cadre du projet, il est prévu d ‘établir une documentation technique pour l’ armement complet de la zone. Zonage planifié (ciblé) en 6 à 12 parcelles avec possibilité d’assemblage ou de fractionnement. Le projet sera mis en œuvre dans la conception et la construction de la formu...
  • curprev 21:1321:13, 2 December 2021DG Regio talk contribs 13,407 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 13,727 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 13,614 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 13,720 bytes +2,404 Created claim: summary (P836): The scope of the project includes the creation of a business activity zone in the Świdwinski District for the needs of private investors. As part of the project, it is planned to prepare technical documentation concerning the comprehensive armament of the zone. The planned division of the zone (targetally) into 6 to 12 plots with the possibility of merging or division. The project will be implemented in a formula design and build. The applicant...
  • curprev 18:3718:37, 21 October 2020DG Regio talk contribs 11,316 bytes −2,006 Removed claim: summary (P836): The material scope of the project includes the creation of a business activity zone in Swidwiński for private investors. The project is intended to prepare technical documentation for the comprehensive arms of the zone. The planned division of the zone (target) in 6 to 12 parcels with the possibility of combining or splitting. The project will be carried out in design and demolition. Applicant plans to obtain a final construction permit in 3 r...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 09:5909:59, 11 March 2020DG Regio talk contribs 12,032 bytes +2,006 Created claim: summary (P836): The material scope of the project includes the creation of a business activity zone in Swidwiński for private investors. The project is intended to prepare technical documentation for the comprehensive arms of the zone. The planned division of the zone (target) in 6 to 12 parcels with the possibility of combining or splitting. The project will be carried out in design and demolition. Applicant plans to obtain a final construction permit in 3 rd/...

25 February 2020

18 February 2020

31 January 2020

14 January 2020