Revision history of "Reconstruction of the building at 45 Baltycka Street in Olsztyn for the promotion of professional and social activation of people with disabilities." (Q132839)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 93,160 bytes +10 Changed label, description and/or aliases in pt
  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 93,150 bytes +102 Set a claim value: summary (P836): O projeto envolve a adaptação do edifício existente às necessidades das pessoas com deficiência – os principais utilizadores da oficina de terapia ocupacional. O âmbito das obras de construção inclui pisos: rés-do-chão, rés-do-chão (excluindo as instalações do conselho imobiliário) e um fragmento do sótão (novas oficinas: psicólogo, revisão, aconselhamento pessoal, instalações sanitárias), bem como uma nova escadaria com um elevador para pessoas com...

20 March 2024

15 January 2024

13 December 2023

6 July 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 89,514 bytes −1,050 Changed label, description and/or aliases in da, sk, fi, ro, cs, lv, bg, sv, ga, lt, el, sl, et, pt, mt, fr, hu, nl, hr, es, and other parts

24 October 2022

27 July 2022

  • curprev 17:5017:50, 27 July 2022DG Regio talk contribs 89,743 bytes +58,261 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 18,728 bytes +3,138 Created claim: summary (P836): Le projet consiste à adapter le bâtiment existant aux besoins des personnes handicapées — les principaux utilisateurs des ateliers d’ergothérapie. Le champ d’application des travaux de construction comprend les planchers: rez-de-chaussée, rez-de-chaussée (à l’exclusion des locaux du Conseil successoral) et fragment grenier (nouveaux studios: psychologue, révision, ingéniosité personnelle, installations sanitaires) ainsi que la construction d’un...
  • curprev 19:2719:27, 2 December 2021DG Regio talk contribs 15,590 bytes +194 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 15,835 bytes +208 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 15,627 bytes −198 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 15,825 bytes +2,947 Created claim: summary (P836): The project involves adapting the existing building to the needs of people with disabilities – the main users of the workshop of occupational therapy. The scope of construction works includes floors: ground floor, ground floor (excluding the premises of the housing estate council) and a fragment of the attic (new workshops: psychologist, reviewing, personal advice, sanitary facilities) as well as a new staircase with an elevator for the disabled...
  • curprev 16:0316:03, 21 October 2020DG Regio talk contribs 12,878 bytes −2,298 Removed claim: summary (P836): The project involves adapting the existing building to the needs of people with disabilities, the main users of the workshop. The scope of construction works includes floors: ground, ground floor (excluding Osiena Council premises) and attainments (new staff: psychological, review, personal situation, sanitary facilities) as well as a new staircase with a lift for disabled people and a convenient access for the main entrance to the building fr...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:1213:12, 10 March 2020DG Regio talk contribs 13,454 bytes +2,298 Created claim: summary (P836): The project involves adapting the existing building to the needs of people with disabilities, the main users of the workshop. The scope of construction works includes floors: ground, ground floor (excluding Osiena Council premises) and attainments (new staff: psychological, review, personal situation, sanitary facilities) as well as a new staircase with a lift for disabled people and a convenient access for the main entrance to the building from...

25 February 2020

18 February 2020

31 January 2020

14 January 2020