Revision history of "Construction of a communal road from the district road 1448N through Nikielkowo and Wójtowo to DK 16" (Q132699)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 93,406 bytes −1 Changed label, description and/or aliases in pt
  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 93,407 bytes +80 Set a claim value: summary (P836): O projeto envolve a construção de uma estrada plenamente funcional que liga o município de Barczewo à rede RTE-T através da DK 16. Esta estrada terá um comprimento de 3,1 km no total com a largura dos troços: 6 m – comprimento. 1,827 m e 5 m de comprimento. É um metro. Além disso, o viaduto ferroviário com o comprimento de 28,08 m, a largura da estrutura total de 13 m será reconstruída. Esta infraestrutura, que comunica o município com a rede rodovi...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 16:3316:33, 2 March 2023DG Regio talk contribs 90,569 bytes −1,414 Changed label, description and/or aliases in ro, lv, fr, da, et, ga, sk, cs, lt, de, sv, es, hr, fi, sl, pt, hu, nl, el, mt, bg, and other parts

25 October 2022

24 October 2022

27 July 2022

  • curprev 17:4917:49, 27 July 2022DG Regio talk contribs 90,309 bytes +58,459 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:5919:59, 2 December 2021DG Regio talk contribs 18,820 bytes +3,249 Created claim: summary (P836): Le projet prévoit la construction d’une route entièrement fonctionnelle (municipale) reliant la municipalité de Barczewo au réseau RTE-T via DK 16. Cette route aura une longueur totale de 3,1 km avec la largeur des tronçons: 6 m — longueur. 1,827 m et 5 m — longueur. 1,305 m. En outre, un viaduc ferroviaire d’une longueur de 28,08 m, d’une largeur totale de 13 m, sera reconstruit. Cette infrastructure, qui communique la municipalité avec le rése...
  • curprev 19:5919:59, 2 December 2021DG Regio talk contribs 15,571 bytes +185 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:4615:46, 21 October 2020DG Regio talk contribs 15,825 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4615:46, 21 October 2020DG Regio talk contribs 15,664 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4615:46, 21 October 2020DG Regio talk contribs 15,821 bytes +3,075 Created claim: summary (P836): The project involves the construction of a fully functional road connecting the municipality of Barczewo with the TEN-T network via DK 16. This road will have a length of 3,1 km in total with the width of the sections: 6 m – long. 1.827 m and 5 m long. It’s 1 feet. In addition, the railway viaduct with the length of 28.08 m, the width of the total structure of 13 m will be rebuilt. This infrastructure, which communicates the Municipality with th...
  • curprev 15:4615:46, 21 October 2020DG Regio talk contribs 12,746 bytes −2,409 Removed claim: summary (P836): The project involves the construction of a fully functional road (the municipality) linking the municipality of Barzewo to the TEN-T network through DK 16. This road will have a total length of 3.1 km over the width of the sections: 6 m in length 1.827 m and 5 m in length 1.305 m. In addition, a rail viaduct with a length of 28.08 m, a total width of 13 m will be reconstructed. It is intended to run the mobile traffic of the Olsztyn region, wh...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0613:06, 10 March 2020DG Regio talk contribs 13,433 bytes +2,409 Created claim: summary (P836): The project involves the construction of a fully functional road (the municipality) linking the municipality of Barzewo to the TEN-T network through DK 16. This road will have a total length of 3.1 km over the width of the sections: 6 m in length 1.827 m and 5 m in length 1.305 m. In addition, a rail viaduct with a length of 28.08 m, a total width of 13 m will be reconstructed. It is intended to run the mobile traffic of the Olsztyn region, whic...

25 February 2020

18 February 2020

31 January 2020

14 January 2020