Revision history of "Construction of additional floating bridges in Iława inland port" (Q132654)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3616:36, 10 October 2024DG Regio talk contribs 87,361 bytes +11 Changed label, description and/or aliases in pt
  • curprev 16:3616:36, 10 October 2024DG Regio talk contribs 87,350 bytes +118 Set a claim value: summary (P836): O objetivo do investimento é a construção de pontes adicionais flutuantes no porto interior de Iława. As plataformas flutuantes planificadas para amarração temporária das embarcações mais pequenas estarão localizadas paralelamente ao cais (pontes 5 e 6) e na rampa de lançamento (ponte n.o 7 com uma armadilha e pavimento do lado da rampa de lançamento). A acessibilidade das pontes para as pessoas com deficiência será assegurada através de um elevador...

20 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2320:23, 2 March 2023DG Regio talk contribs 84,474 bytes −1,744 Changed label, description and/or aliases in ro, it, fr, da, lv, fi, hu, sk, es, hr, cs, bg, et, el, de, ga, sl, pt, nl, lt, sv, mt, and other parts

22 October 2022

2 July 2022

  • curprev 23:0423:04, 2 July 2022DG Regio talk contribs 85,394 bytes +54,778 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 18,338 bytes +3,105 Created claim: summary (P836): L’objet de l’investissement est la construction de ponts supplémentaires opérant dans le port intérieur d’Iława. Les ponts flottants prévus utilisés pour l’amarrage temporaire des plus petits bateaux seront situés parallèlement au front de mer (ponts nos 5 et 6) et par un glissement (pont no 7 ainsi qu’un piège et un trottoir à partir de l’accès réel au glissement). L’accessibilité des ponts pour les personnes handicapées sera assurée par un asc...
  • curprev 19:5319:53, 2 December 2021DG Regio talk contribs 15,233 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 15,531 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 15,407 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 15,515 bytes +2,804 Created claim: summary (P836): The object of the investment is the construction of additional bridges floating in the inland port in Iława. Planned floating platforms for temporary mooring of the smallest vessels will be located parallel to the quay (bridges 5 and 6) and at the slipway (bridge No. 7 with a trap and pavement from the side of the slipway). Accessibility of bridges for people with disabilities will be ensured through a mobile lift. They will increase the standar...
  • curprev 18:1018:10, 21 October 2020DG Regio talk contribs 12,711 bytes −2,212 Removed claim: summary (P836): The subject of the investment is the construction of ancillary bridges in the inland port of Iława. The planned floating mooring facilities for the smallest floating vessels will be located in parallel to the pier (bridges 5 and 6) and on slop (bridge No 7 with trap and pavement from access to slipu). The accessibility of bridges for disabled people will be ensured through a mobile lift. It will increase the standard built in 2015 from the EU...

24 September 2020

15 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 13:0613:06, 10 March 2020DG Regio talk contribs 13,209 bytes +2,212 Created claim: summary (P836): The subject of the investment is the construction of ancillary bridges in the inland port of Iława. The planned floating mooring facilities for the smallest floating vessels will be located in parallel to the pier (bridges 5 and 6) and on slop (bridge No 7 with trap and pavement from access to slipu). The accessibility of bridges for disabled people will be ensured through a mobile lift. It will increase the standard built in 2015 from the EU In...

25 February 2020

18 February 2020

31 January 2020

14 January 2020