Revision history of "Construction of railway line No. 582 Czarnca – Włoszczowa Płn." (Q127870)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 66,558 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 66,559 bytes +44 Set a claim value: summary (P836): Este projeto diz respeito à construção de uma nova linha ferroviária n.o 582, que liga a estação do ramal de Czarnca à estação de Włoszczowa Północ. A necessidade de construir uma nova linha ferroviária deve-se ao facto de não existir atualmente qualquer possibilidade de entrada a partir da linha ferroviária 61 de Kielce até à linha 4 (CMK) em direção a Varsóvia e Lodz, sem alterar o sentido da viagem. O mesmo acontece com a relação oposta. O projet...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

5 November 2022

27 October 2022

26 October 2022

19 October 2022

27 September 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:3311:33, 2 December 2021DG Regio talk contribs 14,844 bytes +2,156 Created claim: summary (P836): Le projet en question concerne la construction d’une nouvelle ligne de chemin de fer no 582 reliant la gare de Czarnca à la gare de Włoszczowa Północ. La nécessité de construire une nouvelle ligne de chemin de fer est due au fait qu’il n’est actuellement pas possible d’entrer de la ligne 61- de Kielce à la ligne 4 (CMK) en direction de Varsovie et Łódź, sans changer de direction. Il en va de même de la relation inverse. Le projet envisagé compre...
  • curprev 11:3311:33, 2 December 2021DG Regio talk contribs 12,688 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 12,990 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 12,865 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 12,991 bytes +2,046 Created claim: summary (P836): This project concerns the construction of a new railway line No. 582 connecting the Czarnca branch station with Włoszczowa Północ station. The need to build a new railway line is due to the fact that there is currently no possibility of entry from the railway line 61 from Kielce to line 4 (CMK) towards Warsaw and Łódź, without changing the direction of the journey. The same is true of the opposite relationship. The planned project will include t...
  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 10,945 bytes −1,604 Removed claim: summary (P836): The project concerns the construction of a new railway line No 582 connecting the junction signal box between Czarnca and the Italian North Station. The need for the construction of a new railway line is due to the fact that it is currently not possible to enter 61 from the Kielce line on line No 4 (CMK) in the direction of Warsaw and Łódź without changing the direction of travel. The same situation applies to the reverse relationship. The pla...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4612:46, 10 March 2020DG Regio talk contribs 11,256 bytes +1,604 Created claim: summary (P836): The project concerns the construction of a new railway line No 582 connecting the junction signal box between Czarnca and the Italian North Station. The need for the construction of a new railway line is due to the fact that it is currently not possible to enter 61 from the Kielce line on line No 4 (CMK) in the direction of Warsaw and Łódź without changing the direction of travel. The same situation applies to the reverse relationship. The plann...

25 February 2020

18 February 2020

31 January 2020

14 January 2020