Revision history of "Bypass layout of the city of Włoszczowa – construction of the bypass of the city of Włoszczowa within the voivodeship road No. 786 together with the connection with the voivodeship road 742 and 785/Stage I – Włoszczowy ring road within DW 786/" (Q127869)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 13:1213:12, 2 March 2023DG Regio talk contribs 88,186 bytes −1,806 Changed label, description and/or aliases in lv, it, ro, fr, sv, da, sk, ga, hu, hr, fi, et, el, es, sl, cs, bg, nl, lt, de, pt, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 16:5416:54, 27 July 2022DG Regio talk contribs 87,869 bytes +57,514 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:3311:33, 2 December 2021DG Regio talk contribs 17,604 bytes +2,905 Created claim: summary (P836): Projet mis en œuvre dans la conception et la construction du système, situé dans le district de Włoszczów dans la municipalité de Włoszczowa. La construction du contournement de la ville de Włoszczów — étape I — de l’intersection avec la rue Koniecpolska à la rue Partyzant (inclusion dans la DW 786) prévoit la connexion de deux routes provinciales no 786, 742 à l’extérieur du centre-ville sur son côté sud. La longueur du pontage m. Włoszczowa es...
  • curprev 11:3311:33, 2 December 2021DG Regio talk contribs 14,699 bytes +325 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 14,813 bytes +310 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 14,503 bytes −278 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 14,781 bytes +2,751 Created claim: summary (P836): Project implemented in the system design and build, located in Włoszczowa district in Włoszczowa commune. The construction of the Włoszczowa ring road – stage I – from the junction with Koniecpolska Street toPartyzantów Street (inclusion to the DW 786) provides for a connection of two voivodeship roads no. 786, 742 outside the city centre on its southern side. The length of the bypass m. Włoszczowa is approx. 7.42 km, long extension approx. It’s...
  • curprev 15:2715:27, 21 October 2020DG Regio talk contribs 12,030 bytes −2,212 Removed claim: summary (P836): Project run in a design and construction system located in the Italian County in the Italian municipality. Construction of the Italian bypass — Stage I — from the junction with ul.KonieczPolish to take part in the event (inclusion in the DW 786) provides for the connection of two regional roads 786, 742 outside the city centre on its southern side. The length of the bypass m. Italian is around 7.42 km long. 2.27 km. The proposed surface load s...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4612:46, 10 March 2020DG Regio talk contribs 12,948 bytes +2,212 Created claim: summary (P836): Project run in a design and construction system located in the Italian County in the Italian municipality. Construction of the Italian bypass — Stage I — from the junction with ul.KonieczPolish to take part in the event (inclusion in the DW 786) provides for the connection of two regional roads 786, 742 outside the city centre on its southern side. The length of the bypass m. Italian is around 7.42 km long. 2.27 km. The proposed surface load sha...

25 February 2020

18 February 2020

31 January 2020

14 January 2020