Revision history of "Extension of Voivodeship Road No. 754 Ostrowiec Św. — Bałtów – Czekarzewice – border of the voivodship, approx. 29.3 km/Expansion DW 754 from km 1+ 912 to 29+ 269/" (Q127860)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 92,530 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 92,526 bytes −431 Set a claim value: summary (P836): Projeto em fase de execução. DW754 atravessa áreas de edifícios. e não-construções. demolição, relocalização de capelas, cruzes, estacas de árvores, forte. lenço e fundo de fileiras. Pedra nas entradas das valas, expansão da classe DW 754, portador.115kN/eixo do km 1 + 912 para 29 + 269 de comprimento. 27.357 km-alargamento, reforço da estrutura da nave- em folha. gr.4 cm com SMA11, -w-w-w-w-w-wo gr. 6 cm com AC16W, -w-wo nivelamento. (zal. a partir...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1320:13, 2 March 2023DG Regio talk contribs 90,560 bytes +5,722 Changed label, description and/or aliases in da, it, sk, sv, et, lv, bg, hr, ga, ro, fr, cs, el, fi, lt, de, mt, es, hu, pt, nl, sl, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3821:38, 2 July 2022DG Regio talk contribs 81,499 bytes +50,857 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:3611:36, 2 December 2021DG Regio talk contribs 17,424 bytes +3,152 Created claim: summary (P836): Projet au stade de la mise en œuvre. DW754 traverse le bâtiment et les zones non-bâtiment.Il comprend: robe de démolition, transfert de chapelles, croix, abattage d’arbres, pentes fortes et fond de rangées. Pierre aux entrées des fossés, extension de DW 754 G, portant.115kN/essieu du km 1 + 912 à 29 + 269 longueur. 27,357 km-largeur, renforcement de la structure de la nef.- feuilles en. gr.4 cm avec SMA11, -w-wa lier. gr.6 cm avec AC16W, -w-wa n...
  • curprev 11:3611:36, 2 December 2021DG Regio talk contribs 14,272 bytes +229 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 14,482 bytes +234 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 14,248 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 14,481 bytes +2,457 Created claim: summary (P836): Project at the implementation stage. DW754 runs through areas of buildings. and non-builds. demolition, relocation of chapels, crosses, tree cuttings, strong. scarf and bottom of rows. Stone at ditch inlets, expansion of DW 754 class, carrier.115kN/axis from km 1 + 912 to 29 + 269 long. 27.357 km-enlargement, reinforcement of the nave structure- in sheet. gr.4 cm with SMA11, -w-w-w-w-w-w-wo gr. 6 cm with AC16W, -w-wo levelling. (zal. from the lo...
  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 12,024 bytes −1,761 Removed claim: summary (P836): A project in the implementation phase. DW754 runs through built-up areas and non-urban areas: demolition waste, the transfer of files, crosses, tree felling, consolidation of turbot and the bottom of the government. 754 kN/axis 115 + 912 to 29 + 269 W 27.357 km-widening, reinforcement of the structure of the refund.gr.4 cm of SMA11, -wo-wa linking gr.gr.6cm with AC16W, -w-wa blunn. (no from the load-bearing capacity) -8 cm with AC16W, subBuddh...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4612:46, 10 March 2020DG Regio talk contribs 12,497 bytes +1,761 Created claim: summary (P836): A project in the implementation phase. DW754 runs through built-up areas and non-urban areas: demolition waste, the transfer of files, crosses, tree felling, consolidation of turbot and the bottom of the government. 754 kN/axis 115 + 912 to 29 + 269 W 27.357 km-widening, reinforcement of the structure of the refund.gr.4 cm of SMA11, -wo-wa linking gr.gr.6cm with AC16W, -w-wa blunn. (no from the load-bearing capacity) -8 cm with AC16W, subBuddhis...

25 February 2020

18 February 2020

31 January 2020

14 January 2020