Revision history of "“Expansion of voivodship road No. 762 on sections:/Expansion of the Voivodeship Road No. 762 on the section from the border of Gm. Chęciny i.e. km 25+ 198 to the bridge facility on the river Łososina (Wierna River) in Bocheniec, i.e. km 27 + 138 len" (Q127858)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2206:22, 9 October 2024DG Regio talk contribs 96,581 bytes −3 Changed label, description and/or aliases in pt
  • curprev 06:2206:22, 9 October 2024DG Regio talk contribs 96,584 bytes −67 Set a claim value: summary (P836): O projeto encontra-se em fase de execução. O projeto inclui obras de construção: —desenvolvimento da estrada C. G a 1,65 km. A estrutura do pavimento gr.42 cm garante uma capacidade de carga de 115 kN/eixo – construção de drenagem da estrada com valas abertas e um canal chuvoso – construção de uma bicicleta a pé. comprimento aproximado de 1,59 km. Konstr. nave com asfalto de betão abrasivo. gr. 4 cm irá garantir uma maior durabilidade e maior segura...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1320:13, 2 March 2023DG Regio talk contribs 94,254 bytes +1,161 Changed label, description and/or aliases in da, lv, it, sk, sv, fr, et, pt, cs, ga, mt, ro, fi, lt, hu, hr, de, nl, el, es, sl, bg, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3821:38, 2 July 2022DG Regio talk contribs 90,970 bytes +59,105 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:3611:36, 2 December 2021DG Regio talk contribs 18,169 bytes +3,245 Created claim: summary (P836): Le projet est en cours de mise en œuvre. Le projet comprend des travaux de construction: —prolongation de la classe routière. G pour dl.1,65 km. La construction de la surface du gr.42 cm fournira une capacité de charge de 115 kN/essieu — construction du drainage routier par fossés ouverts et conduit de pluie — construction d’un vélo à pied. longueur d’environ 1,59 km. Nef Constr. avec asphalte en béton abrasif. gr. 4 cm assurera une plus grande...
  • curprev 11:3611:36, 2 December 2021DG Regio talk contribs 14,924 bytes +393 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 14,970 bytes +335 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 14,635 bytes −332 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 14,967 bytes +2,819 Created claim: summary (P836): The project is at the stage of implementation. The project includes construction works: —development of the road C. G at 1,65 km. The structure of the gr.42 cm pavement ensures a load capacity of 115 kN/axis – construction of drainage of the road with open ditches and a rainy channel – construction of a walking-bike. length approx.1,59km. Konstr. nave with abrasive concrete asphalt. gr. 4 cm will ensure greater durability and greater safety and...
  • curprev 15:2615:26, 21 October 2020DG Regio talk contribs 12,148 bytes −2,171 Removed claim: summary (P836): The project is in the process of being implemented. The project covers works: The extension of the channel of glue. G in d.1.65 km. The structure of the pavement of the gr.42 cm will provide a load capacity of 115 kN/axis — construction of road drainage and storm-buildings. 4 cm will ensure greater sustainability as well as greater safety and driving comfort. Construction of pavement dl.0.17 km, and platforms on the ankle of bacon gr.8cm. The...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4612:46, 10 March 2020DG Regio talk contribs 13,034 bytes +2,171 Created claim: summary (P836): The project is in the process of being implemented. The project covers works: The extension of the channel of glue. G in d.1.65 km. The structure of the pavement of the gr.42 cm will provide a load capacity of 115 kN/axis — construction of road drainage and storm-buildings. 4 cm will ensure greater sustainability as well as greater safety and driving comfort. Construction of pavement dl.0.17 km, and platforms on the ankle of bacon gr.8cm. The co...

25 February 2020

18 February 2020

31 January 2020

14 January 2020