Revision history of "“Expansion of sanitary sewage system in Radoszyce agglomeration”" (Q127791)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1604:16, 11 October 2024DG Regio talk contribs 91,504 bytes −3 Changed label, description and/or aliases in pt
  • curprev 04:1604:16, 11 October 2024DG Regio talk contribs 91,507 bytes +23 Set a claim value: summary (P836): Com quase 100 % da drenagem da comuna de Radoszyce e um pequeno nível de águas residuais, existe uma disparidade significativa entre a quantidade de água retirada do sistema de abastecimento de água 300milm3/ano e a quantidade de águas residuais entregues à estação de tratamento de águas residuais 180 mil m3/ano. A falta de uma gestão regulamentada das águas residuais implica o perigo de infiltrar cada vez mais águas residuais no ambiente, prejudica...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1320:13, 2 March 2023DG Regio talk contribs 88,311 bytes −385 Changed label, description and/or aliases in sk, lv, it, da, et, fi, es, pt, ga, ro, el, cs, hu, fr, lt, hr, sv, sl, nl, bg, de, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 16:5316:53, 27 July 2022DG Regio talk contribs 86,572 bytes +56,352 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1411:14, 2 December 2021DG Regio talk contribs 17,626 bytes +3,225 Created claim: summary (P836): Avec près de 100 % de drainage de la commune de Radoszyce et peu de drainage, il y a une disproportion significative entre la quantité d’eau prélevée sur le réseau d’approvisionnement en eau 300tys.m³/an et la quantité d’eaux usées rejetées à la station d’épuration — 180ty.m³/an. L’absence de gestion réglementée des eaux résiduaires fait courir le risque que de plus en plus d’eaux usées pénètrent dans l’environnement, ce qui nuit à l’écologie de...
  • curprev 11:1411:14, 2 December 2021DG Regio talk contribs 14,401 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 14,696 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 14,569 bytes −131 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 14,700 bytes +2,946 Created claim: summary (P836): With almost 100 % of the drainage of Radoszyce commune and a small degree of sewage, there is a significant disparity between the amount of water taken from the water supply system 300thousandm³/year and the amount of sewage delivered to the sewage treatment plant-180 thousand m³/year. The lack of regulated sewage management entails the danger of infiltrating more and more sewage into the environment, damaging the ecology of Radoszyce commune an...
  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 11,754 bytes −2,546 Removed claim: summary (P836): With close to 100 % of the Radorzyce municipality and the limited extent of the skad, there is a considerable gap between the amount of water taken from the mains network 300tys.m³/rok and the amount of waste water sent to the treatment plant ścieków-180tys.m³/rok.. In the absence of regulated waste water management, there is a danger that more and more waste water is being diverted into the environment, harming the ecology of the municipality...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4212:42, 10 March 2020DG Regio talk contribs 13,017 bytes +2,546 Created claim: summary (P836): With close to 100 % of the Radorzyce municipality and the limited extent of the skad, there is a considerable gap between the amount of water taken from the mains network 300tys.m³/rok and the amount of waste water sent to the treatment plant ścieków-180tys.m³/rok.. In the absence of regulated waste water management, there is a danger that more and more waste water is being diverted into the environment, harming the ecology of the municipality o...

25 February 2020

18 February 2020

31 January 2020

14 January 2020