Revision history of "Revitalisation of the Poranian Sea Areas to support the Social Activation Programme" (Q126143)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 63,693 bytes −2 Changed label, description and/or aliases in pt
  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 63,695 bytes +18 Set a claim value: summary (P836): O investimento realizado no modo «conceção e construção» inclui a conceção (desenvolvimento da documentação do projeto) e, em seguida, a realização de obras de construção no âmbito de: 1. Desenvolvimento do espaço público na ul. Exército polaco: construção de pavimentos, parque infantil com elementos de arquitectura de água, gazebo, parque de cordas, equipamento de treino de rua, suporte de bicicletas, bancos, endurecimento da área para efeitos da f...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0920:09, 2 March 2023DG Regio talk contribs 61,280 bytes −5 Changed label, description and/or aliases in bg, sk, it, da, mt, cs, lv, et, lt, fi, pt, de, ro, fr, ga, el, sv, nl, sl, hr, hu, es, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 16:2916:29, 27 July 2022DG Regio talk contribs 59,173 bytes +36,867 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2808:28, 2 December 2021DG Regio talk contribs 14,154 bytes +1,930 Created claim: summary (P836): L’investissement réalisé en mode «conception et construction» implique la conception (développement de la documentation de conception) puis la réalisation de travaux de construction dans le cadre de: 1. Développement de l’espace public à ul. Armée polonaise: construction de trottoirs, aire de jeux avec des éléments d’architecture de l’eau, gazebos, parc à cordes, dispositifs d’entraînement de rue, porte-vélos, banc, durcissement de la zone pour...
  • curprev 08:2808:28, 2 December 2021DG Regio talk contribs 12,224 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:5110:51, 21 October 2020DG Regio talk contribs 12,510 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5110:51, 21 October 2020DG Regio talk contribs 12,368 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5110:51, 21 October 2020DG Regio talk contribs 12,516 bytes +1,750 Created claim: summary (P836): The investment carried out in the “design and build” mode includes designing (developing project documentation) and then carrying out construction works in the scope of: 1. Development of public space at ul. Polish Army: construction of pavements, playground with elements of water architecture, gazebo, rope park, street workout equipment, bicycle stand, benches, hardening of the area for the purpose of the mobile stage, including extension and r...
  • curprev 10:5110:51, 21 October 2020DG Regio talk contribs 10,766 bytes −1,266 Removed claim: summary (P836): The investment in “design and demolition” mode consists of the design (design of the design documentation) followed by the execution of the works on: 1. The management of public spaces at ul. The Polish Army: pavements, playgrounds with elements of water architecture, altons, funiculars, funiculars, workout stands, bicycle stands, benches, scleral sites for the mobile scene together with the extension and alteration of the building, electrical...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 10:1510:15, 10 March 2020DG Regio talk contribs 10,739 bytes +1,266 Created claim: summary (P836): The investment in “design and demolition” mode consists of the design (design of the design documentation) followed by the execution of the works on: 1. The management of public spaces at ul. The Polish Army: pavements, playgrounds with elements of water architecture, altons, funiculars, funiculars, workout stands, bicycle stands, benches, scleral sites for the mobile scene together with the extension and alteration of the building, electrical i...

25 February 2020

18 February 2020

31 January 2020

14 January 2020