Revision history of "Revitalisation of railway lines No 694/157/190/191 Bronów-Bieniowiec-Skoczów-Goleszów-Cieszyn/Wisła Głębce" (Q124489)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

9 October 2024

  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 70,878 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 70,879 bytes −46 Set a claim value: summary (P836): O projeto envolve a reabilitação das linhas ferroviárias 694, 157, 190 e 191 nos seguintes troços: — linha n.o 694 Troço Bronów – Bieniowiec do km 0,000 ao km 3.217, – linha n.o 157 Troço Bieniowiec – Skoczów do km 12.650 ao km 23.721, – linha n.o 190 de Skoczów – Goleszów – Cieszyn do km 21.506 ao km 39.122 – linha n.o 191 Goleszów – Wisła Głębce do km -0.550 ao km 19.543, com um comprimento total de 51.997 km. Após o projeto, os parâmetros técnico...

22 March 2024

15 January 2024

13 December 2023

28 June 2023

12 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 16:3216:32, 2 March 2023DG Regio talk contribs 67,079 bytes +222 Changed label, description and/or aliases in lv, ro, fr, da, it, et, ga, sk, cs, lt, de, bg, es, hr, fi, hu, sl, pt, nl, el, mt, sv, and other parts

26 January 2023

25 January 2023

25 October 2022

21 October 2022

27 September 2022

27 July 2022

  • curprev 16:0816:08, 27 July 2022DG Regio talk contribs 62,979 bytes +37,302 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

3 December 2021

2 December 2021

  • curprev 08:3708:37, 2 December 2021DG Regio talk contribs 19,660 bytes +1,883 Created claim: summary (P836): Le projet comprend la remise en état des lignes de chemin de fer 694, 157, 190 et 191 sur les sections suivantes: — ligne no 694 Bronów — section Bieniowiec du km 0,000 à 3,217 km, ligne 157 de Bieniowiec — Skoczów du km 12.650 au km 23.721, — ligne 190 de Skoczów — Goleszów — Cieszyn du km 21.506 au km 39.122 — ligne no 191 Goleszów — Wisła Głębce du km — 0,550 au km 19,43. d’une longueur totale de 51,997 km. Après la mise en œuvre du projet, l...
  • curprev 08:3708:37, 2 December 2021DG Regio talk contribs 17,777 bytes +184 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 18,032 bytes +172 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 17,860 bytes −167 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 18,027 bytes +1,779 Created claim: summary (P836): The project involves rehabilitation of railway lines 694, 157, 190 and 191 on the following sections: — line No. 694 Bronów – Bieniowiec section from km 0.000 to km 3.217, – line no. 157 section Bieniowiec – Skoczów from km 12.650 to km 23.721, – line No. 190 of Skoczów – Goleszów – Cieszyn from km 21.506 to km 39.122 – line no 191 Goleszów – Wisła Głębce from km -0.550 to km 19.543. with a total length of 51.997 km. After the project, the techn...
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 16,248 bytes −1,384 Removed claim: summary (P836): The project involves the rehabilitation of railway lines 694, 157, 190 and 191 on the following sections: — Line No 694 — Bieniwiec segment from km 0,000 to km 3,217, — line No 157 of the Bieniwiec — Skoczów section from km 12,650 to km 23,721, — line No 190 section Skoczów — Golezów — Goleów — Cieszyn from km 21,506 to km 39,122 — line No 191 Golezów — Wis³ów Glębce from km -0,550 to km 19,543 with a total length of 51.997 km. Once the projec...

17 July 2020

22 June 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)