Revision history of "Extension of sanitary sewage system in the Lubanian Agglomeration area" (Q122558)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3318:33, 8 October 2024DG Regio talk contribs 53,786 bytes +10 Changed label, description and/or aliases in pt
  • curprev 18:3318:33, 8 October 2024DG Regio talk contribs 53,776 bytes +32 Set a claim value: summary (P836): O projeto diz respeito a: na primeira fase da construção do sistema de esgotos sanitários em Grzybowo, juntamente com o coletor de transmissão que atravessa Sycowa Huta, com inclusão na rede existente na cidade de Łubiana, na fase II da construção do sistema de esgotos sanitários que assegura a drenagem de esgotos da aldeia de Sycowa Huta e do resto da aldeia de Grzybowo. Os objectivos do projecto são os seguintes: melhoria do ambiente natural na ag...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0120:01, 2 March 2023DG Regio talk contribs 52,069 bytes −428 Changed label, description and/or aliases in sk, da, it, el, fi, hr, lv, fr, pt, et, sl, lt, sv, ga, es, ro, de, mt, hu, cs, nl, bg, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 15:4015:40, 27 July 2022DG Regio talk contribs 50,383 bytes +30,572 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 13,179 bytes +1,575 Created claim: summary (P836): Le projet concerne: dans la première étape de la construction du système d’assainissement sanitaire à Grzybowo, avec le collecteur de transport passant par Sice Huta avec inclusion dans le réseau existant dans le village de Łubiana, dans la phase II de la construction du système d’assainissement sanitaire assurant le rejet des eaux usées du village de Sycowa Huta et le reste du village de Grzybowo. Les objectifs du projet sont les suivants: l’am...
  • curprev 07:3707:37, 2 December 2021DG Regio talk contribs 11,604 bytes +143 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,900 bytes +129 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,771 bytes −131 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 11,902 bytes +1,520 Created claim: summary (P836): The project concerns: in the first stage of the construction of sanitary sewage system in Grzybowo together with the transmission manifold running through Sycowa Huta with inclusion in the existing network in the town of Łubiana, in stage II of the construction of sanitary sewage system ensuring the drainage of sewage from the village of Sycowa Huta and the rest of the village Grzybowo. The objectives of the project shall be: improvement of the...
  • curprev 09:5309:53, 21 October 2020DG Regio talk contribs 10,382 bytes −1,087 Removed claim: summary (P836): The project concerns: in Stage I of the construction of the sanitary sewage system in the town of Grzybowski together with a collector that passes through Sycowa Huta with the integration into the existing network in the town of Łubiana, in Stage II, the construction of a sanitary sewage system ensuring the discharge of sewage from the town of Sycowa Huta and the rest of the village of Grzybowski. The aims of the project are to: the improvemen...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 09:5709:57, 10 March 2020DG Regio talk contribs 10,176 bytes +1,087 Created claim: summary (P836): The project concerns: in Stage I of the construction of the sanitary sewage system in the town of Grzybowski together with a collector that passes through Sycowa Huta with the integration into the existing network in the town of Łubiana, in Stage II, the construction of a sanitary sewage system ensuring the discharge of sewage from the town of Sycowa Huta and the rest of the village of Grzybowski. The aims of the project are to: the improvement...

25 February 2020

18 February 2020

31 January 2020

14 January 2020